My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-27_PERMIT FILE - C1981019A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-05-27_PERMIT FILE - C1981019A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 8:40:24 PM
Creation date
10/20/2021 8:38:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/27/2021
Doc Name
Table of Contents
Section_Exhibit Name
Volume 15 Table of Contents
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 4.05.6 Sedimentation Ponds..............................................................................................................5 <br /> 4.05.7 Discharge Structures..............................................................................................................7 <br /> 4.05.8 Acid-forming and Toxic-Forming Spoil................................................................................7 <br /> 4.05.9 Post-Mining Impoundments...................................................................................................7 <br /> 4.05.10 Underground Mine Entry and Access Discharges.................................................................7 <br /> 4.05.11 Groundwater Protection.........................................................................................................7 <br /> 4.05.12 Protection of Groundwater Recharge Capacity......................................................................7 <br /> 4.05.13 Surface and Groundwater Monitoring....................................................................................8 <br /> 4.05.14 Transfer of Wells ...........................................................................................................................11 <br /> 4.05.15 Water Rights and Replacment............................................................................................. 11 <br /> 4.05.16 Dischrage of Water into an Underground Mine..................................................................12 <br /> 4.05.17 Postmining and Rehabilitation of Sediment Pond, Diversions, Impoundments, and <br /> TreatmentFacilities ....................................................................................................................................12 <br /> 4.05.18 Stream Buffer Zones............................................................................................................12 <br /> 4.06 TOPSOIL............................................................................................................................13 <br /> 4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS ....................... 13 <br /> 4.08 USE OF EXPLOSIVES......................................................................................................14 <br /> 4.08.2 Pre-Blast Survey..................................................................................................................14 <br /> 4.09 DISPOSAL OF EXCESS SPOIL........................................................................................14 <br /> 4.10—4.12 COAL MINE WASTE BANKS, COAL MINE WASTE, SLIDES AND OTHER <br /> DAMAGE 16 <br /> 4.13 CONTEMPORANEOUS RECLAMATION......................................................................16 <br /> 4.14 BACKFILLING AND GRADING.....................................................................................17 <br /> 4.14.1 General Requirements..........................................................................................................17 <br /> 4.14.2 General Grading Requirements............................................................................................18 <br /> 4.14.3 Covering Coal and Acid and Toxic Forming Materials....................................................... 18 <br /> 4.14.4 Thin Overburden..................................................................................................................18 <br /> 4.14.5 Thick Overburden................................................................................................................18 <br /> 4.14.6 Re-grading or Stabilizing Rills and Gullies.........................................................................18 <br /> 4.15 REVEGETATION REQUIREMENTS...............................................................................18 <br /> 4.16 POSTMINING LAND USE ................................................................................................18 <br /> 4.16.1 General.................................................................................................................................18 <br /> 4.17 AIR RESOURCES PROTECTION.....................................................................................19 <br /> 4.18 PROTECTION OF FISH,WILDLIFE,AND RELATED VALUES..................................19 <br /> 4.19 PROTECTION OF UNDERGROUND MINING...............................................................20 <br /> 4.20 SUBSIDENCE CONTROL.................................................................................................20 <br /> 4.21 COAL EXPLORATION......................................................................................................20 <br /> 4.22 CONCURRENT SURFACE AND UNDERGROUND MINING ......................................20 <br /> 4.23 AUGER AND HIGHWALL MINING................................................................................21 <br /> 4.24 OPERATIONS IN ALLUVIAL VALLEY FLOORS .........................................................21 <br /> 4.23 AUGER AND HIGHWALL MINING................................................................................21 <br /> 4.23.1 Scope 21 <br /> 4.23.2 Performance Standards....................................................................................................................21 <br /> 4.23.2(1)Undisturbed Areas of Coal Shall be Left in Unmined Sections..................................................21 <br /> 4.23.2(2)Abandoned or Active Underground Mine Workings..................................................................21 <br /> 4.23.2(3) Contemporaneous Surface and Auger(Highwall)Mining..........................................................21 <br /> 4.23.2(4)Prevention of Pollution of Surface and Ground Water and Fire Hazards...................................22 <br /> 4.23.2(5)Holes Not Need to be Plugged....................................................................................................22 <br /> 4.23.2(6)Division Shall Prohibit Auger(Highwall)Mining......................................................................22 <br /> 4.23.2(7)Backfill and Grading Requirements............................................................................................22 <br /> 4.25 OPERATIONS ON PRIME FARMLANDS .......................................................................22 <br /> iii Revision Date: 5/18/21 <br /> Revision No.: TR-147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.