Laserfiche WebLink
TABLE OF CONTENTS <br /> 2.05.3 (5) Topsoil....................................................................................................................... <br /> 2.05.3 (6) Overburden.................................................................................................................................75 <br /> 2.05.3 (7) Coal Handling Structures...........................................................................................................79 <br /> 2.05.3 (8) Coal Mine Waste and Non-Coal Processing Waste...................................................................79 <br /> 2.05.3 (9)Return of Coal Mine Waste to Abandoned Workings................................................................79 <br /> 2.05.4(1)Reclamation Plan........................................................................................................................80 <br /> 2.05.4(2)(a)Reclamation Timetable..........................................................................................................80 <br /> 2.05.4(2)(b)Reclamation Costs.................................................................................................................80 <br /> 2.05.4(2)(c)Backfilling Plan.....................................................................................................................80 <br /> 2.05.4(2)(d)Topsoil Salvage.....................................................................................................................80 <br /> 2.05.4(2)(e)Reclamation Revegetation.....................................................................................................81 <br /> 2.05.4(2)(f-h)Disposal,Mine Openings,Water and Air Control..............................................................81 <br /> 2.05.5 Post-Mining Land Uses....................................................................................................................82 <br /> 2.05.6 Mitigation of Impacts of Mining Operations.......................................................................83 <br /> 2.05.6(1)Air Pollution Contol Plan...........................................................................................................83 <br /> 2.05.6(2)Fish and Wildlife Plan................................................................................................................83 <br /> 2.05.6(3)(a)Protection of the Hydrologic Balance....................................................................................86 <br /> 2.05.6(3)(b)(i&ii)Hydrologic Controls...................................................................................................87 <br /> 2.05.6(4)Protection of Public Parks and Historic Places........................................................................103 <br /> 2.05.6(5-6) Surface Mining near Underground Mining; Subsidence Control.........................................103 <br /> 2.06 PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES................................103 <br /> 2.06.1-3 Scope, Experimental Mining,and Mountain Top Removal....................................................... 103 <br /> 2.06.4 Steep Slope Mining............................................................................................................103 <br /> 2.06.5 Variance from Approximate Original Contour Restoration Requirements........................ 103 <br /> 2.06.6 Prime Farmlands................................................................................................................103 <br /> 2.06.7 Reclamation Variance........................................................................................................103 <br /> 2.06.8 Alluvial Valley Floor(AVF).............................................................................................. 104 <br /> 2.06.9—2.06.11 Augering,Processing Plants,In-Situ Processing.....................................................108 <br /> 2.06.12.1 Coal Refuse Piles...............................................................................................................109 <br /> 2.07—2.10 VARIOUS..........................................................................................................................109 <br /> RULE 3—PERFORMANCE BOND...........................................................................................................1 <br /> RULE 4—PERFORMANCE STANDARDS...............................................................................................1 <br /> 4.02 SIGNS AND MARKERS.....................................................................................................1 <br /> 4.02.1 Specifications.........................................................................................................................1 <br /> 4.02.2 Mine and Permit Identification Signs ....................................................................................1 <br /> 4.02.3 Perimeter Markers..................................................................................................................1 <br /> 4.02.4 Duration of Maintenance........................................................................................................ 1 <br /> 4.02.5 Stream Buffer Zone Markers ................................................................................................. 1 <br /> 4.02.6 Blasting Signs ........................................................................................................................1 <br /> 4.02.7 Topsoil Markers.....................................................................................................................1 <br /> 4.03 ROADWAYS........................................................................................................................1 <br /> 4.03.1 Haul Roads.............................................................................................................................1 <br /> 4.03.2 Access Roads.........................................................................................................................2 <br /> 4.03.3 Light-Use Roads ....................................................................................................................3 <br /> 4.04 SUPPORT FACILITIES.......................................................................................................4 <br /> 4.05 HYDROLOGIC BALANCE................................................................................................4 <br /> 4.05.1 General Requirements............................................................................................................4 <br /> 4.05.2 Water Quality Standards and Effluent Limitations................................................................4 <br /> 4.05.3 Diversions and Conveyance of a Watershed Less than One Square Mile.............................4 <br /> 4.05.4 Stream Channel Diversions(Relocation of Streams).............................................................5 <br /> 4.05.5 Sediment Control Measures...................................................................................................5 <br /> ii Revision Date: 5/18/21 <br /> Revision No.: TR-147 <br />