My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-19_PERMIT FILE - M2021049
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021049
>
2021-10-19_PERMIT FILE - M2021049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 2:22:07 AM
Creation date
10/20/2021 5:19:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021049
IBM Index Class Name
PERMIT FILE
Doc Date
10/19/2021
Doc Name
Adequacy Review Response
From
VIMA Partners, LLC
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2—VIMA Partners, LLC <br /> WQCC. To the best of the applicant's knowledge, groundwater monitoring is not required. <br /> Topsoil will be stockpiled to the west of the reservoir grading and be used to reclaim the <br /> areas outside of the water surface. Once the operation additional topsoil may be brought <br /> in to cover the remainder of the site outside of the reservoir water level if needed. The <br /> revegetation process will include diverse seeding as stated in Exhibit J. There are no <br /> buildings or structures on the property and a sign has been posted at the entrance of the <br /> site with the correct requirements. Finally, the operator acknowledges all requirements if <br /> a spill occurs on the site. <br /> (d) Where applicable, plans for topsoil segregation, preservation, and replacement; for <br /> stabilization, compaction, and grading of spoil; and for revegetation. The revegetation plan <br /> shall contain a list of the preferred species of grass, legumes, forbs, shrubs or trees to be <br /> planted, the method and rates of seeding and planting, the estimated availability of viable <br /> seeds in sufficient quantities of the species proposed to be used, and the proposed time <br /> of seeding and planting; <br /> In areas that are not inundated approximately 4" of plant growth medium will be <br /> replaced, and or soils will be amended as needed to establish proper plant growth. <br /> (e) A plan or schedule indicating how and when reclamation will be implemented. Such plan <br /> or schedule shall not be tied to any specific date but shall be tied to implementation or <br /> completion of different stages of the mining operation as described in Rule 6.4.4(e). The <br /> plan or schedule shall include: <br /> (i) An estimate of the periods of time which will be required for the various <br /> stages or phases of reclamation; <br /> Once excavation of the reservoir has been completed, it is estimated that the <br /> reclamation process, including filling the reservoir, will take about 4-6 <br /> months. <br /> (ii) A description of the size and location of each area to be reclaimed during <br /> each phase; and <br /> The water will fill roughly 44 surface acres at its highest point; the area that <br /> may need to be vegetated is 12 acres. <br /> (iii) An outline of the sequence in which each stage or phase of reclamation will <br /> be carried out. <br /> 1. Completion of excavating operation. <br /> 2. Fine grading of outer edge of reservoir. <br /> 3. Reservoir filled with raw water to a highwater elevation of 4913'. <br /> TST,ING.CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.