My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-19_HYDROLOGY - M2001085 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2021-10-19_HYDROLOGY - M2001085 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 6:19:24 AM
Creation date
10/19/2021 2:54:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
10/19/2021
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
JPL
JLE
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division has identified four approaches for operators: <br /> 1. File a financial warranty that will ensure backfilling of the pit to cover the exposed ground water to a <br /> depth of two feet above the static ground water level or, <br /> 2. Obtain a court approved augmentation plan prior to exposing ground water or, <br /> 3. File a financial warranty to cover the cost of installing a clay liner or slurry wall that meets the <br /> Division of Water Resources requirements for preventing ground water exposure or, <br /> 4. Obtain approval from the Division of Water Resources that acknowledges compliance with the SEO's <br /> requirements pursuant to §37-90-137(11). <br /> The Division will work with operators on an individual basis as they move to implement one of these plans. It <br /> is likely that options 1 and 3 will require the submittal of a technical revision or an amendment to the existing <br /> permit depending on the nature of the current mining and reclamation plan and the proposed changes. <br /> Increased financial warranties, as a result of these modifications, may be posted in a phased manner not to <br /> exceed three years. Amendments or revisions currently under review will be required to be approved by <br /> April 30, 2011 and may use the phased financial warranty approach described above. New applications going <br /> forward or presently under review by the Division will be required to meet the requirements of one of the <br /> options 1-4 at the time of application approval. Failure of affected operators to initiate contact with the <br /> Division and gain compliance as described above could result in an enforcement action being issued by the <br /> Division. <br /> If you have any questions, please contact Tony Waldron at 303-866-3567, extension 8150. <br /> cc: Permit Id Site Name <br />
The URL can be used to link to this page
Your browser does not support the video tag.