My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-19_HYDROLOGY - M2001085 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2021-10-19_HYDROLOGY - M2001085 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2021 6:19:24 AM
Creation date
10/19/2021 2:54:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
10/19/2021
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
JPL
JLE
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 30, 2010 <br /> Permittee Address <br /> RE: Mining Operations with Exposed Ground water <br /> To Whom It May Concern: <br /> The Division of Reclamation Mining and Safety is responsible for ensuring that Sand and Gravel mining <br /> operators comply with the requirements of the Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials (Act) and the Mineral Rules and Regulations of the Colorado Mined Land Reclamation <br /> Board for the Extraction of Construction Materials (Rules). Among these requirements are provisions for the <br /> protection of water resources. The Act requires that reclamation plans must ensure minimization of <br /> disturbances to the prevailing hydrologic balance, including disturbances to the quantity of water in the area <br /> affected by mining and in the surrounding areas. §34-32.5-116(4)(h). Rule 3.1.6(1)(a) requires compliance <br /> with Colorado water laws and regulations governing injury to existing water rights both during and after <br /> mining. Permits must specify how the permittee will comply with applicable Colorado water laws and <br /> regulations governing injury to existing water right rights. Rule 6.3.3(j); Rule 6.4.5(2)(c). After an extensive <br /> review,the Division determined that several operators may not have appropriate permit conditions to <br /> address certain reclamation liabilities arising from impacts to water resources. <br /> In September 2009 the Division of Water Resources(DWR) updated its Guidelines for Sand and Gravel Pits. <br /> These guidelines provide guidance on achieving compliance with state law regarding replacement of <br /> depletions from sand and gravel mining,thus the guidelines provide a benchmark for the protection of <br /> hydrologic balance required under the Act and Rules. As noted in the Guidelines, sand and gravel <br /> operations which expose groundwater without complying with state law create a reclamation liability by <br /> impacting available groundwater. <br /> State law requires that any person exposing ground water must obtain a well permit from the SEO pursuant <br /> to §37-90-137(11). Because exposed groundwater results in out-of-priority water depletions, operations <br /> which expose ground water must also eventually obtain a water-court approved augmentation plan. <br /> Currently, several operators do not have either an augmentation plan or bonding to provide an alternative <br /> method to mitigate injurious stream depletions that result from mining-related exposure of ground <br /> water. The Division has a statutory duty to ensure that lands affected by mining are reclaimed in a manner <br /> that complies with state law and to ensure that operators have sufficient bonding to achieve reclamation. In <br /> order to assist operators in achieving compliance with these requirements,the Division proposes that, by <br /> April 30, 2011, operators should contact the Division and agree upon a plan for achieving compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.