My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-18_PERMIT FILE - M2021050
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021050
>
2021-10-18_PERMIT FILE - M2021050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:17 PM
Creation date
10/19/2021 1:33:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021050
IBM Index Class Name
Permit File
Doc Date
10/18/2021
Doc Name
Cost Estimate
From
DRMS
To
Jeff Chenoweth
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reveg Worksheet Cont'd Task # 002 Page 8 of 9 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilization of Equipment <br />Site: J & P Caliche Pit Permit Action: M2021050 Permit/Job#: M2021050 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 10/18/2021 County: Baca <br />User: RAR <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: M050-005 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$21.28 <br />$37.94 <br />$47.67 <br />Operating Cost/Hour: <br />$26.55 <br />$50.48 <br />$56.21 <br />Operator Cost/Hour: <br />$20.54 <br />$20.54 <br />$20.54 <br />Helper Cost/Hour: <br />$0.00 <br />$23.53 <br />$23.53 <br />Total Unit Cost/Hour: <br />$68.37 <br />$132.49 <br />$147.95 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />CAT 12M <br />16.01 <br />$49.96 <br />$68.37 <br />1 <br />$118.33 <br />$68.37 <br />$250.00 <br />Cat 627G w/push- <br />43.48 <br />$188.81 <br />$132.49 <br />2 <br />$642.60 <br />$264.98 <br />$500.00 <br />pull <br />Cat D7RDSXR <br />32.01 <br />$81.02 <br />$132.49 <br />1 <br />$213.51 <br />$132.49 <br />$250.00 <br />Series II <br />Subtotals: 1 $974.44 1 $465.84 1 $1,000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ <br />Fleet Size <br />Haul Trip <br />Return Trip <br />unit <br />Cost/hr/ fleet <br />Cost/hr/ fleet <br />Light Duty Pickup, 4x4, 1 T. <br />$20.51 <br />1 <br />$20.51 <br />$20.51 <br />Crew <br />Water Tanker, 3,500 Gal. <br />$46.35 <br />1 <br />$46.35 <br />$46.35 <br />Subtotals: 1 $66.86 1 $66.86 <br />Caliche Pit#2 Cost Estimate October 2021 <br />8 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.