Laserfiche WebLink
Reveg Worksheet Cont'd Task 4 002 Page 9 of 9 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />SPRINGFIELD <br />Total one-way travel distance: <br />40.00 miles <br />Average Travel Speed: <br />55.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />`* <br />$6,823.38 <br />two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />$97.25 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Catiche Pit#2 Cost Estimate <br />9 1 P a g e <br />Non- <br />Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.73 <br />0.73 <br />0.73 <br />0.73 <br />0.70 <br />NA <br />0.70 <br />NA <br />2.85 <br />1.45 <br />Total job time: 5.71 Hours <br />Total job cost: $6,921 <br />October 2021 <br />