My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-14_PERMIT FILE - M2021059
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2021-10-14_PERMIT FILE - M2021059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:07:49 PM
Creation date
10/14/2021 11:16:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
10/14/2021
Doc Name Note
(23 maps Submitted)
Doc Name
Incomplete Submittal Corrections
From
Telesto
To
DRMS
Email Name
JLE
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Mr. Peter Hays <br /> Date: October 8, 2021 <br /> Page 5 <br /> EXHIBIT D - MINING PLAN <br /> Comment 9 <br /> On Page 6, Exhibit D, the Applicant states the entire site consists of approximately 114 <br /> acres. The Applicant listed the proposed permitted acreage on the application form as 118 <br /> acres. Please explain this discrepancy the revise Exhibit D or the application form <br /> accordingly. <br /> Response 9 <br /> The initial, internal application was based on preliminary data as reported by the Weld <br /> County Assessor's office (118 acres). The 114.25 acres is based upon an Alta survey <br /> prepared by a licensed professional surveyor. Not changing the 118 acres to 114.25 acres <br /> in the application was an oversight on our part. We have updated the application to reflect <br /> the survey-verified 114.25 acres as reported in Exhibits A and D. <br /> EXHIBIT F - RECLAMATION PLAN MAP <br /> Comment 10 <br /> The Applicant submitted Reclamation Plan Maps (Exhibits R-1 through F-3) labeled as <br /> "drafts". The Division does not review draft copies of application exhibits. Please provide <br /> final copies of the Exhibit F maps for Division review. <br /> Response 10 <br /> The exhibits no longer include the draft marker. <br /> Comment 11 <br /> The Exhibit F maps must be prepared and signed by a registered land surveyor, <br /> professional engineer or other qualified person pursuant to Rule 6.2.1(2)(b). Please <br /> provide signed copies of the Exhibit F maps. <br /> Response 11 <br /> We typically stamp engineering drawings after respective agencies review to incorporate <br /> changes into a final form and to certify the changes are accepted by the engineer and <br /> agency. To meet the rule requirement, we have provided professional engineer's seal as <br /> requested on pertinent engineering drawings. <br /> 20211006_Response to DRAB(A utoRecovered).docx T E L E S T O <br />
The URL can be used to link to this page
Your browser does not support the video tag.