My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-08_REVISION - M1987026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2021-10-08_REVISION - M1987026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:53:03 PM
Creation date
10/11/2021 5:47:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
REVISION
Doc Date
10/8/2021
Doc Name
Adequacy Review Response
From
Colorado Quarries Inc.
To
DRMS
Type & Sequence
CN1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Black Obsidian Pit—Permit M-1987-026 <br /> 112c Conversion Application <br /> Rule 6.4.4 <br /> Exhibit D <br /> Mining Plan (rev 8/2/21) <br /> Introduction <br /> Current operations consist of a small surface quarry operation contained within a 9.0-acre permitted <br /> (110) area; the surface quarry area itself occupies approximately 3.0 acres. Obsidian is the only product <br /> that is mined and exported from the site. The known extent of the obsidian deposit being quarried <br /> extends beyond the existing quarry area, and extends to a much larger area of land outside the 110 <br /> permit. The thickness of overburden lying above the top of the known obsidian deposit ranges from <br /> zero feet (i.e., obsidian visible in surface outcrops) to approximately 40 feet deep (as determined <br /> through mining and exploratory drilling). In many places the known vertical thickness of the obsidian <br /> deposit has been found to be greater than 100 feet. <br /> The operator wishes to expand the permitted acreage in order to be able to access and extract additional <br /> obsidian deposits for the following reasons: to extend the life of the mine, to increase the annual <br /> production of the mine, and investigate additional markets for this unique material. The expanded area <br /> will allow an increased rate of production, potentially up to several hundred thousand tons per year,yet <br /> still extend the life of the mine several more decades. <br /> In this conversion,the operator wishes to expand the existing quarry operation to contiguous land, and is <br /> now being called Phase I. Phase I fully comprises the southern half of the 112c permit area. The 112c <br /> conversion also includes a significant amount of land to the north of the existing quarry and Phase I, <br /> where preliminary determinations indicate a second substantial deposit of black obsidian. This will be <br /> considered as Phase II in this conversion, though no details of Phase II are presented at this time. This <br /> separate deposit has not been well defined on the ground, and it is only delineated in a preliminary <br /> manner on the maps at this time. The operator is including this land area in the 112c permit expansion. <br /> When the operator is ready to investigate and develop the northern Phase II obsidian deposit, he will <br /> contact DRMS to discuss any necessary documents to provide. <br /> Please see the Exhibit C maps, which depict the existing permitted area and 112c permitted area <br /> boundaries, and the various areas of activity. The maps depict the existing 110 operation, Phase I of the <br /> expanded 112c operation, the general location of Phase II, and the landownership pattern. The maps <br /> show the pattern of BLM-managed land and privately-owned land. <br /> There is a 9.50-acre 110 permit adjoining and partially overlapping the proposed 112c expansion of the <br /> Black Obsidian Pit. The Lucky VI Quarry(Buffalo Hunter Lode—Sharp Lode) is permit M-2016-015, <br /> operator Ed Lyons. Approximately 3.17 acres of the Lucky VI Quarry permit(on the Sharp Lode) lies <br /> within the Black Obsidian expansion area, along the southeastern boundary. See the maps in Exhibit C <br /> showing the boundary locations. Colorado Quarries wishes to include this 3.16-acre overlap area in its <br /> 112c expansion due to the shallow obsidian deposit present there, which is not a desired commodity <br /> extracted from the 110 permit. Colorado Quarries has been in discussion with Mr. Lyons, with the <br /> intention of including the 3.16-acre area in the 112c permit,through a release request of the Sharp Lode <br /> portion effective upon approval of the 112c expansion. That paperwork will be filed separately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.