Laserfiche WebLink
Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> <br />Task description: Secondary mobilize reclamation crew/equipment <br />Site: Cerise Mine Permit Action: TR2 Permit/Job#: M2010058 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 06B State: Colorado Abbreviation: None <br />Date: 9/27/2021 County: Garfield Filename: M058-06b <br />User: ACY <br />Agency or organization name: DRMS <br /> <br />EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $21.28 $37.94 $47.67 <br />Operating Cost/Hour: $26.55 $50.48 $56.21 <br />Operator Cost/Hour: $20.54 $20.54 $20.54 <br />Helper Cost/Hour: $0.00 $23.53 $23.53 <br />Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr/uni <br />t <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip <br />Cost/hr/ fleet <br />DOT Permit <br />Cost/ fleet <br />Drill/Broadcast <br />Seeder with <br />Tractor <br />25.00 $7.98 $68.37 1 $76.35 $68.37 $250.00 <br />Power Mulcher <br />(Bowie LD-90) <br />6.00 $14.98 $68.37 1 $83.35 $68.37 $250.00 <br /> <br />Subtotals: $159.70 $136.74 $500.00 <br /> <br /> <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ <br />unit <br />Fleet Size Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Flatbed Truck, 4x2, 15K GVW $77.98 1 $77.98 $77.98 <br />Light Duty Pickup, 4x4, 3/4 T. $68.29 1 $68.29 $68.29 <br />Subtotals: $146.27 $146.27 <br /> <br />