Laserfiche WebLink
Mobilization Worksheet Cont’d Task # 06A Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br />EQUIPMENT HAUL DISTANCE and Time Nearest Major City or Town within project area region: GLENWOOD SPRINGS <br />Total one-way travel distance: 10.00 miles <br />Average Travel Speed: 45.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $10,463.80 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $65.01 <br /> Transportation Cycle Time: Non- <br />Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.22 0.22 <br />Return Time (Hours): 0.22 0.22 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 1.44 0.44 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 2.89 Hours <br /> <br />Total job cost: <br /> <br />$10,529 <br />