Laserfiche WebLink
Page 11 of 13 <br /> <br />MISCELLANEOUS TRUCK WORK <br /> <br />Task description: <br />Dust Suppression <br /> <br />Permit Action: Raindance Reservoir <br />Site: #2 Application Permit/Job#: M2021049 <br />Raindance Reservoir #2 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 07 State: Colorado Abbreviation: None <br />Date: 8/18/2021 County: Weld Filename: M049-07a <br />User: RAR <br /> <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Make and Model: Water Tanker, 5,000 Gal. Horsepower: 175 <br />Attachment 1: Shift Basis: 1 per day <br />Attachment 2: Weight: 15.00 <br />Labor Unit 1: Specialty Truck Driver (US Tons) <br />Labor Unit 2: <br /> <br /> <br />Cost Breakdown: <br /> <br /> Utilization % <br />Ownership Cost/Hour: $33.45 NA <br />Operating Cost/Hour: $41.96 100 <br />Operator Cost/Hour: $25.57 NA <br /> <br />Total Unit Cost/Hour: $100.98 <br /> <br />Total Fleet Cost/Hour: $100.98 <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Truck(s) Total job time: Hours <br />40.00 <br /> <br /> <br />Unit cost: $100.98 /Hour Total job cost: <br />$4,039 <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br /> <br />