My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-09_PERMIT FILE - M2021049
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021049
>
2021-09-09_PERMIT FILE - M2021049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2021 9:59:51 AM
Creation date
9/19/2021 9:24:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021049
IBM Index Class Name
Permit File
Doc Date
9/9/2021
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
VIMA Partners, LLC
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 13 <br /> <br />Truck Cycle Time: <br /> <br />Truck Exchange Time: 0.80 Minutes Adjusted for site altitude: 0.800Minutes <br />Truck Load Time: 5.520 Minutes Adjusted for site altitude: 5.520Minutes <br />Truck Maneuver and Dump 1.20 Minutes Adjusted for site altitude: 1.200Minutes <br />Time: <br /> <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Rutted dirt, <br />penetration 5.0 <br />Haul Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 1000.00 0.00 5.00 5.00 1550 0.852 <br />2 2110.00 0.00 5.00 5.00 1550 1.361 <br />3 3556.00 0.00 5.00 5.00 1550 2.294 <br />4 1120.00 0.00 5.00 5.00 1550 0.723 <br /> <br />Haul Time: minutes <br />5.230 <br />Return Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 1120.00 0.00 5.00 5.00 3296 0.710 <br />2 3556.00 0.00 5.00 5.00 3296 1.079 <br />3 2110.00 0.00 5.00 5.00 3296 0.640 <br />4 1000.00 0.00 5.00 5.00 3296 0.303 <br /> <br />Return Time: minutes <br />2.732 <br />Total Truck Cycle Time: minutes <br />15.482 <br /> <br />Loading Tool unit <br />Production 710.05 LCY/Hour Adjusted for job efficiency: 589.34 LCY/Hour <br />Truck Unit Production <br />289.85 LCY/Hour Adjusted for job efficiency: 240.58 LCY/Hour <br /> <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> <br />Adjusted hourly truck team production: 481.15 LCY/Hour <br />Adjusted single truck/loader team production: 481.15 LCY/Hour <br />Adjusted multiple truck/loader team production: LCY/Hour <br />481.15 <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Team(s) Total job time: Hours <br />60.38 <br /> <br /> <br />Unit cost: $3.116 /LCY Total job cost: <br />$816,808 <br /> <br /> <br />CIRCES Cost Estimating Software <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.