My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-17_PERMIT FILE - M2021058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021058
>
2021-09-17_PERMIT FILE - M2021058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 7:53:05 AM
Creation date
9/19/2021 9:20:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021058
IBM Index Class Name
Permit File
Doc Date
9/17/2021
Doc Name
Incompleteness Response
From
Union Milling Contractors
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Management Plan <br /> Water control measures maintenance will be completed within 7 calendar days after failed ECMs <br /> have been identified. Sediment from erosion control structures will be removed,as necessary, <br /> and disposed in designated areas. <br /> e. Record Keeping and Documenting Inspections <br /> Inspections and maintenance activities(Appendix 4)will be documented, and records will be kept <br /> in the facilities office for a period of 3 years. <br /> f. Agency Storm Water Inspections <br /> The Facility Manager, or his designated representative,must walk the site with the regulatory <br /> inspector and document any deficiencies or suggestions noted during the inspection. The Facility <br /> Manger shall prepare an Inspection Report(Appendix 4). Deficiencies of any type,field or <br /> documentation-related,will be noted on the Inspection Report as a deficiency and resolved as <br /> soon as practicable or as directed. <br /> The Facility Manger or his designated representative will report to the agency inspection <br /> immediately,but no later than 1-hour after the inspector has left the jobsite. All storm water or <br /> erosion and sediment(E&S) agency visits to the aggregate site,whether an official inspection <br /> occurred or not,will be reported to the Facility Manger or his designated representative. Any <br /> agency inspector, including MSHA and utility inspectors that comment on storm water control <br /> measures(drainage inlet protection,track out, etc.)must be reported to the Facility Manger or his <br /> designated representative. <br /> A log of all inspections by Federal, State, or local storm water or other environmental agencies <br /> shall be kept in the SWMP Binder. The log form can be found in Appendix 5 and must include <br /> the date and time of the visit and whether a report was issued,or will be issued, as a result of the <br /> inspection. All inspection reports issued by an agency must be report to the Facility manager,but <br /> no later 24-hours of receipt. <br /> References <br /> Casados,A., and Leyba,P. Forest Engineers, Santa Fe National Forest,February 7,2000. <br /> CASQA (California Stormwater Quality Association),2003,California Stormwater BMP <br /> Handbook(http://www.cabmphandbook.com/documents/mininp-/SE-5.pdf <br /> Chow,V.T., 1959,Open Channel Hydraulics,McGraw-Hill,New York. <br /> FHWA(Federal Highway Administration), 1995.Best Management Practices for Erosion <br /> and Sediment Control FHWA-SLP-94-005. Federal Highway Administration, Sterling <br /> VA. <br /> Highway Task Force, 1071 Handbook of Steel Drainage& Highway Construction <br /> Products, second Edition,American Iron and Steel Institute, Washington, D.C. <br /> CJK SPECIALITY AGGREGATES <br /> CIK Milling Company,LLC <br /> Leadville,Colorado <br /> Page 10 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.