My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-16_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2021-09-16_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 7:35:53 AM
Creation date
9/16/2021 8:51:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
REVISION
Doc Date
9/16/2021
Doc Name
Adequacy Review Response #2
From
Albert Frei & Sons Inc.
To
DRMS
Type & Sequence
AM9
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walstrum Spur Amendment, Exhibit E—Reclamation Plan revised September 2021 <br /> 6.0 RECLAMATION SCHEDULE <br /> 6.4.5(2)(e) A plan or schedule indicating how and when reclamation will be implemented. Such plan or schedule <br /> shall not be tied to any specific date but shall be tied to implementation or completion of different stages of the <br /> mining operation as described in Rule 6.4.4(e). The plan or schedule shall include: <br /> 6.4.5(2)(e)(i) An estimate of the periods of time which will be required for the various stages or phases of <br /> reclamation; <br /> 6.4.5(2)(e)(ii)A description of the size and location of each area to be reclaimed during each phase; and <br /> 6.4.5(2)(e)(iii)An outline of the sequence in which each stage orphase of reclamation will be carried out. <br /> Reclamation within the Existing Quarry will occur as previously approved. Parcel B2, added as part of the Spur <br /> Amendment, will be reclaimed in conjunction with the reclamation of the adjacent Existing Quarry West Slope <br /> Section. The eastern one-third of Parcel Al, added as part of the Spur Amendment, will be reclaimed as <br /> Industrial/Commercial/Public Gathering in conjunction with the reclamation of the adjacent Existing Quarry North <br /> Slope Section (see Exhibit F-1). <br /> Reclamation on benched areas in the Spur Amendment will occur concurrently with the mining operation. Once <br /> each bench is mined to its finished elevation,the Operatorwill begin mining the next lower level while simultaneously <br /> reclaiming the previously finished bench. <br /> 7.0 RECLAMATION DETAILS <br /> 6.4.5(2)(f) A description of each of the following: <br /> 6.4.5(2)(O(i) Final grading-specify maximum anticipated slope gradient or expected ranges thereof, <br /> 6.4.5(2)(t)(ii) Seeding-specify types, mixtures, quantities, and expected time(s) of seeding and planting; <br /> 6.4.5(2)(f)(iii) Fertilization-if applicable, specify types, mixtures, quantities and time of application; <br /> 6.4.5(2)(f)(iv) Revegetation -specify types of trees, shrubs, etc., quantities, size and location; and <br /> 6.4.5(2)(f)(v) Topsoiling- specify anticipated minimum depth or range of depths for those areas where topsoil will <br /> be replaced <br /> 7.1 Final Grading <br /> Grading will be performed to create a final topography appropriate to the planned post-mining land use and mimic <br /> surrounding natural slopes and cliffs. All grading will be done in a manner to control erosion and to protect areas <br /> outside the affected lands from slides or other damage. All backfilling and grading will be completed as soon as <br /> feasible after the mining process has been completed. <br /> Reclaimed Quarry Floor <br /> The final quarry floor will be sloped down at approximately 0.5% to 0.6% from east to west to establish positive <br /> drainage to the main entrance at an approximate elevation of 7,220 feet. Stormwater Best Management Practices <br /> (BMP's) will be installed near the main entrance for treatment prior to discharge under the existing stormwater <br /> discharge permit. Finished grades are presented in Exhibit F (F-1 and F-2). The toe of the completed slopes within <br /> the Existing Quarry will be at an approximate elevation of 7,240 feet. The quarry floor will be graded for future use <br /> and stabilized against erosion to maintain the surface and drainage. The toe of mined slopes will progressively <br /> increase towards the eastern end of the Spur Amendment to a maximum toe elevation of 7,270 feet.Typical sections <br /> for reclaimed slopes are illustrated in Exhibit F (F-1 and F-2). <br /> Slope Reclamation within Spur Amendment <br /> The reclaimed slopes within the Spur Amendment will have an overall maximum slope of 1 H:1V above an elevation <br /> of 8,000 feet and 0.6H:1V below 8,000 feet. After mining is completed, the mined slopes that have not been <br /> oTETRA TECH Page 6 1 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.