My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-09_REVISION - M2004044 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004044
>
2021-09-09_REVISION - M2004044 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:08:05 AM
Creation date
9/15/2021 5:54:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004044
IBM Index Class Name
Revision
Doc Date
9/9/2021
Doc Name
Request For Amendment To Permit
From
Aggregate Industries-WCR, Inc.
To
DRMS
Type & Sequence
AM2
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Disturb <br /> Mining Operation ed Area <br /> (acres) <br /> Active Mining Area: <br /> 1. Backfill remaining East Cell mining face and side slopes (2,300 <br /> feet in length averaging 27 feet deep requiring backfill and rough <br /> grading to 3H:1V slopes.) <br /> 2. Rough Grade remaining disturbed areas of the east cell <br /> 3. Replace topsoil on backfilled area of East cell above the HWL <br /> of the reservoir (61.5 acres) <br /> 4. Final Grade East Cell <br /> Miscellaneous Disturbed Areas (Stockpiles, Haul Roads, Conveyor <br /> route) <br /> 1. Replace topsoil on internal haul roads and main site entrance (3 <br /> acres x 0.5') <br /> 2. Replace topsoil on conveyor route (11.5 acres X 0.5') <br /> 3. Replace topsoil on stockpile area (5 acres x 0.5') <br /> 4. Scarify internal haul roads and conveyor route areas <br /> 5. Final grade all miscellaneous areas (8.3 acres x 0.5') <br /> 6. Reseed 20% of all areas in the area of disturbance above <br /> Final Reclamation: <br /> 1. Seeding — entire East Area above the highwater line of the <br /> reservoir plus internal haul route and the conveyor route. <br /> 2. Weed management and re-seeding (20% of the Affected Lands <br /> located above the hi hwater line of the reservoirs) <br /> Total Disturbed Area 83.8 <br /> Diversions and Impoundments <br /> Roads and irrigation ditches will effectively minimize stormwater surface run-on to the <br /> mining site, so run-on diversion structures are not anticipated. During the initial <br /> mining activities, stockpiling of topsoil and overburden on the surface is anticipated. <br /> Diversionary channels, as shown on Exhibit C, will be used divert surface runoff from <br /> leaving each of the Areas or entering the wetlands areas. Surface diversion channels <br /> will convey runoff to settling ponds, prior to discharging to the South Platte River. As <br /> mining progresses and the excavation increases in size, diversionary channels will <br /> convey less runoff because more runoff will enter the mine excavations. Runoff that <br /> collects in the excavations will be conveyed by the dewatering trenches to a common <br /> point, where it will be pumped to the river after sediment settling has occurred, if <br /> necessary. <br /> Aggregate Industries—Tucson South Amendment—MLRB 112 Permit Application <br /> Exhibit D-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.