Laserfiche WebLink
J. Beck <br /> Page 5 <br /> 1 November 2016 <br /> any studies to comply with this Rule,more information regarding the proposed operation will need to be <br /> submitted. The Division will need to know exactly where the proposed permit area will be and where the <br /> mining operation and its facilities will exist within this area. Based on this information,the Division will <br /> then consult with the appropriate State and Federal fish and wildlife management, conservation or land <br /> management agencies to determine the level of detail of the study and the areas possibly needed for <br /> further study. <br /> 28. Section 2.04.12—Prime Farmland Investigation <br /> The required information was not submitted. <br /> 29. Section 2.05.2—Estimated Area for Life of Operation <br /> As per your letter of 28 October 2016,mining is to take place in Section 7,Range 65 West, in Township <br /> 31 South. However,the Healey Mine operated in Section 8,Range 65 West, Township 31 South. These <br /> two areas appear mutually exclusive of each other. Therefore,prior permitting actions for section 8 <br /> would not apply. Please inform DRMS what section you intend to conduct mining in. <br /> 30. Section 2.05.3(5)—Operation Plan—Permit Area—Topsoil <br /> The required information was not submitted. There is some topsoil salvage and replacement information <br /> contained in the permit file for the original Healey Pit(C-1976-014). However,the new permit area is <br /> indicated to be much larger and possibly not within the original Healey Pit area. Regardless, for the new <br /> proposed permit area,youmust submit the information required by Rule 2.04.9. Based on the information <br /> required for Rules 2.04.5 you will then need to submit information to comply with Rule 2.05.3(5). <br /> 31. Section 2.05.3(2)(a)—Operation Plan—Permit Area—Operation Description—Surface Mining <br /> The required information was not submitted. More information regarding the proposed operation will <br /> need to be submitted. The Division will need to know exactly where the proposed permit area will be and <br /> where the mining operation and its associated facilities will exist within this area. <br /> 32. Section 2.05.3(3)—Operation Plan—Permit Area—Mine Facilities <br /> The required information was not submitted. More information regarding the proposed operation will <br /> need to be submitted. The Division will need to know exactly where the proposed permit area will be and <br /> where the mining operation and its associated facilities will exist within this area. <br /> 33. Section 2.05.3(4)—Operation Plan—Permit Area—Ponds,Impoundments, Other Treatment <br /> Facilities,and Diversions <br /> The required information was not submitted. More information regarding the proposed operation will <br /> need to be submitted. The Division will need to know exactly where the proposed permit area will be and <br /> where the mining operation and its associated facilities will exist within this area. <br /> 34. Section 2.05.3(5)—Operation Plan—Permit Area—Topsoil <br /> The required information was not submitted. <br /> APPLICATION i i9i COMPLETENES <br />