Laserfiche WebLink
Appendix F—Toll Milling Agreement <br /> 8. The Byproduct Analysis Addendum and the Concentrate Analysis Addendum are provided <br /> herein. <br /> 9. The Agreement for Geochemical Analysis for Mineral Viability and Toxicity(provided herein) <br /> includes characterization of feedstock and byproduct materials. <br /> 10. The Warranted Condition section was intentionally removed from the Toll Milling <br /> Agreement. <br /> 11. Toll Milling Agreement Item 10 includes Feedstock Quality Standard as less than six inches in <br /> size and free of excess quantities of wood and plants,other organic materials,scrap metal <br /> and other debris that would interfere with processing. <br /> 12. Exhibit C is revised as described in Item#1 and the Byproduct Purchase Agreement <br /> Please feel free to contact me directly with any further questions. <br /> Respectfully submitted, <br /> Angela M. Bellantoni'Ph.D. <br /> Enclosures: <br /> Exhibit C: Milling Plan with Closed Circuit Mill Flow Sheet <br /> Exhibit E:Settling Pond detail figure <br /> Exhibit I: Proof of Filing with County Clerk <br /> Appendix F: Byproduct Purchase Agreement, Geochemical Analysis Agreement, <br /> MSDS for quicklime and sodium bisulfate <br /> Cc:Jeff Carter,Salisbury Gladstone LLC <br />