My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-08_PERMIT FILE - M2010058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010058
>
2021-09-08_PERMIT FILE - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:10:44 PM
Creation date
9/9/2021 8:45:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
PERMIT FILE
Doc Date
9/8/2021
Doc Name
Adequacy Review Response
From
Ben Langenfeld
To
DRMS
Type & Sequence
TR2
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To +13038328106 A s: Page-05 of 14 2021-09-08 22 22 20 GMT 13032008630 From Ben Langenfeld <br /> 2. Min. ing Timetable <br /> Miningperations at the Cerise Mine will take at least 17 years, based on an annual production <br /> of 375�,b0 to 500,000 tons per year(437,000 tons per year average). This is an estimate, and <br /> the lifetW the mine will vary based on market conditions. Table D-1 - Mining Timetable shows <br /> the mir tng sequence at the amount of time for each step. Mining phase area and disturbance <br /> can b `been on the Mining Plan Maps C-2 through C-6. <br /> I'll. <br /> i <br /> l Table D-1 - Mining Timetable <br /> , <br /> Description Time R- . -. <br /> 3uif soi!berm-and,604rbq'irde .st# He. etated,kberm and,pil�:: <br /> in ely'LItS CDf113041 .. ltlll 111, -and, 1-. <br /> 1, �. <br /> Mine reclaim site according to approved plans. Reclamation occurs 16.2 <br /> as mi 'sag has reached its maximum extents in an area <br /> Total 17.9 <br /> 2.1. ui ment <br /> Table '' —Equipment and Facilities shows the equipment and facilities to be located at the <br /> Ceris ine during its life. This is an estimate, and may change over the course of operations in <br /> order t .,facilitate the mining and reclamation plans. <br /> i � <br /> ml Table D-2— Equipment and Facilities <br /> w <br /> Equipment Structures <br /> ;1 Full time <br /> if Loaders 1 Scale 1 <br /> �' *Concrete batch plant 3 <br /> ,x . <br /> Temporary <br /> Loaders 3 Portable crushing plant 1 <br /> Dozers 1 Portable wash plant 1 <br /> Scrapers 2-4 Trash dumpster 1 <br /> Grader 1 Portable toilets 2-4 <br /> f �iG <br /> Water truck 1 <br /> yV, <br /> I 1 <br /> .prise Mine D-2 <br /> Leuicki Asso�iatrs <br /> I tat <br /> i <br /> I�m <br />
The URL can be used to link to this page
Your browser does not support the video tag.