My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-08_PERMIT FILE - M2010058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010058
>
2021-09-08_PERMIT FILE - M2010058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:10:44 PM
Creation date
9/9/2021 8:45:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010058
IBM Index Class Name
PERMIT FILE
Doc Date
9/8/2021
Doc Name
Adequacy Review Response
From
Ben Langenfeld
To
DRMS
Type & Sequence
TR2
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To +13038328106 i Page 13 of 14 2021-09-08 22 22 20 GMT 13032008630 From Ben Langenfeld <br /> 1 <br /> RE""LAMATION COST ESTIMATE EXHIBIT L <br /> R <br /> The wt rpt-case reclamation scenario will occur when all of Phase 1A and 1 B are to be <br /> backfill . It is the largest backf fling action in the life of the mine. Since the mining slopes along <br /> the south and east side of the pit will be mined to final reclaimed slopes, they will not require <br /> backfiling. When mining occurs along the north side of the pit, the backfiliing of Phase 1A will <br /> alreal,'have occurred or will be in progress. Thus, the backfiliing of Phase 1A and 1 B will be <br /> the sciario at which material movement needs are greatest, thus leading to the largest bond. <br /> r <br /> The components of the worst-case reclamation scenario are as follows: <br /> 1. tBackfill and grade Phase 1A to the final contour <br /> �., a. 236,192 CY of backfill placed via loader, haul truck, and dozer from stockpile in <br /> Phase 1 C. <br /> b. Rip all 5 acres to a depth of 12 inches <br /> 2.�1 „ ckfill and grade Phase 1 B to final contour <br /> { , a. 138,904 CY of backfill placed via loader, haul truck, and dozer from stockpile in <br /> Phase 1 C. <br /> b. Rip all 3.8 acres to a depth of 12 inches. <br /> 3.:'Place topsoil across all disturbed areas to be revegetated <br /> I a. Phase 1A = 8,067 CY <br /> b. Phase 1 B =6,131 CY <br /> c. Phase 1C = 15,327 CY <br /> 4.11 1 emove scale and office trailer. <br /> 5.1 ed all retopsoiled areas <br /> a. Mining phases = 18.3 acres <br /> ri. <br /> b. Berms =4.3 acres <br /> ' c. Office and scale area = 0.5 acres <br /> r r• <br /> 6. ulch all seeded areas. Assume <br /> I �� <br /> Based! n the operator's previous reclamation efforts in the area of this site, Table L-1 — <br /> Recla lion Cost Estimate has a cost estimate for the cost of reclaiming the worst-case <br /> scenarip. <br /> •1��: <br /> it <br /> ' rise Mine <br /> ® Lewicki& Associates <br /> Id�Bi <br />
The URL can be used to link to this page
Your browser does not support the video tag.