My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-07_REVISION - M1973021 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2021-09-07_REVISION - M1973021 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2021 4:53:08 PM
Creation date
9/7/2021 10:57:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
9/7/2021
Doc Name Note
Permit Entire Document
Doc Name
Adequacy Review Response
From
Aggregate Industries-WCR, Inc.
To
DRMS
Type & Sequence
AM7
Email Name
ECS
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aggregate Industries, Morrison Quarry <br /> Amendment No.7 to Permit M-1973-021 FYZ <br /> Morrison,CO <br /> Item 8.0 Mined Areas Earthwork <br /> Once the site controls are installed, the grading plan for mined areas will be implemented. All <br /> areas will be appropriately marked to protect vegetation and structures to remain. The <br /> reclamation work areas will then be cleared and grubbed prior to excavation and backfilling. <br /> Available topsoil sources within the earthwork area will be stripped and appropriately stockpiled. <br /> Fill slopes in the upper highwall areas (southwestern corner) of the North Quarry will be placed <br /> and compacted to achieve a 2-foot cover sloped between 2H:1V and 20H:1V. Compaction will <br /> be performed with tracked equipment (D9 bulldozer) performing a minimum number of passes <br /> to achieve specified densities. The North Quarry additional fill area is estimated to require a <br /> minimum aggregate fill volume of 3,227 cubic yards if no additional byproduct material is used <br /> for fill. <br /> Fill slopes in the upper highwall areas of the South and West Quarries (above El. 7,000) will be <br /> placed and compacted to achieve 40-foot-high, 60-foot-wide benches, sloped 1H:1V, with 5- to <br /> 10-foot-wide benches and rockfall catchment berms every fourth bench. Compaction will be <br /> performed with tracked equipment (D9 bulldozer) performing a minimum number of passes to <br /> achieve specified densities. The South and West Quarries (above El. 7,000) are estimated to <br /> require aggregate fill volume of 286,815 cubic yards. <br /> Fill slopes in the lower highwall areas (below El. 7,000) will be placed and compacted to achieve <br /> 10-foot-high, 40-foot wide benches, sloped 1 OH:1V, with 5- to 10-foot-wide benches and rockfall <br /> catchment berms every fourth bench. Compaction will be performed with tracked equipment (D9 <br /> bulldozer) performing a minimum number of passes to achieve specified densities. The South <br /> Quarry (below El. 7,000) is estimated to require aggregate fill volume of 492,067 cubic yards. <br /> The average haul distance for the South and West Quarry Fill areas from the Central Quarry <br /> stockpile area is 1.15 miles (El. 7,000 bench). Final grading of all fill slopes, benches, crest <br /> areas, and toe areas will ensure that water is not allowed to pond on or adjacent to the fill <br /> slopes. Grading will be performed to the proposed slope gradients shown in the Grading Plan <br /> (Exhibit D— Mining Plan). Final subgrades will be developed using survey equipment from Item <br /> 4.0 and a CAT D9 bulldozer or CAT 349 excavator. Final grades, with organic material included, <br /> will be developed using an excavator to lightly spread out the material and prevent compaction. <br /> Item 9.0 Un-mined Areas Earthwork <br /> Areas disturbed within the Morrison Quarry but outside of mining boundaries will be reclaimed to <br /> blend with surrounding topography. This earthwork includes rough grading of approximately <br /> 32.5 acres. Areas to be reclaimed include haul roads, processing areas, and structure <br /> foundations. For areas where steeper slopes will remain, up to 0.33 acre of geosynthetic slope <br /> stabilization will be installed. <br /> Item 10.0 Soil Conditioning <br /> All reclamation areas within the Morrison Quarry will be reclaimed in a manner that allows for <br /> proposed post-mining land use. Reclamation areas will be backfilled as described in Items 8.0 <br /> September 2021 1 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.