MINING PLAN EXHIBrr D(coNT) <br /> setbacks on the East, South & West will still be 25 feet, but the <br /> Perrino House Area and School House Area will be removed. The <br /> mine floor will slope towards the north to preserve the existing <br /> flow characteristics of land. <br /> Typically mining at Colorado Crushing' s, mining operations <br /> are done in cycles . These cycles involve moving a crushing plant <br /> into a mine and beginning to process material until there is a <br /> six month to 1 year supply of rock stockpiled. Once an adequate <br /> supply is processed, the crusher and equipment are moved to <br /> another mine. The stockpiles will be used throughout the year by <br /> the company. As mining ends on a section of the working face it <br /> is temporally graded to 2 : 1 so it is stable when there are no <br /> activities in the mine. Any resciling and revegetation needed is <br /> completed when the area where material is removed will not be <br /> redisturbed. This cycle continues until the mine is played out . <br /> Each time the mine is re-enter mining begins by setting up <br /> the plant and stripping the area to be mined during this cycle. <br /> The topsoil and overburden will be stockpiled along the mine <br /> perimeter setbacks or on the mine floor, i .e. in places where it <br /> will not be disturbed until needed. The approximate location of <br /> the overburden and topsoil piles are shown on the MINING PLAN MAP. <br /> Mining will begin on a section of the slopes created at the <br /> end of the last mining cycle until a near vertical face is open. <br /> This face will be worked to the north and south until it extends <br /> across the property and at that time mining will progress to the <br /> west . As mining progresses thru the site the processing plant <br /> will be set near the open face to reduce the haul distance from <br /> the mine face. <br /> This pit will be operated year-around by Colorado Crushing, <br /> Inc. , weather permitting. There may be periods when the demands <br /> for material are slow and no mining will take place at which time <br /> the mine will become an Intermediate Operation. Stockpiles of <br /> material will be maintained on the site and as the need arises, <br /> it will be hauled to our project sites or sold to the public. <br /> This will be a single stage operation, but the amount of <br /> bonded disturbance will be limited to 35 . 0 26 . 8 acres or less at <br /> any-one-time. This will allow us to use approximately 15 . 0 acres <br /> as a processing plant/stockpile area and approximately 5 acres <br /> for the active mining area and 15 acres of partially reclaimed <br /> area or area being prepared for mining. As mining progresses <br /> around the property the bank slopes will be mined or shaped to <br /> the required grades where they are in their final location. This <br /> will reduce the amount of work that has to be done to reclaim the <br /> 10 (Revised 6/1/17) <br />