MINING PLAN EXHIBIT D(CONT) <br /> Of the 81 . 40 acres ± in the permit area a maximum of 76 . 66 <br /> acres ± will be disturbed by the mining operation. Presented in <br /> this mining plan are detail plans for developing the mine under <br /> 2 different options . The first will be to create slopes around <br /> the site as shown on the EXHIBIT F-1 -RECLAMATION PLAN MAP. This <br /> option leaves the Perrino House Area and the School House Area as <br /> undisturbed islands in the mining area with 3h to lv slopea on <br /> the 3 mined sides of the islands . Option 2 would remove the <br /> Perrino House Area and the School House Area, and leaves a 3h to <br /> 1 v slope along the north side of the permit as shown on the <br /> EXHIBIT F-2-RECLAMATION PLAN MAP. The existing slope along the north <br /> line will not be disturbed. A 25 foot setback will be maintained <br /> along the powerline in addition to the 25 feet side ROW so mining <br /> will not take place within 50 feet for the power poles . <br /> The method of mining discussed below will fit each option <br /> unless otherwise stated. Please use the RECLAMATION PLAN MAPS during <br /> review of the following text for the areas discussed. They show <br /> how the site would look, depending on what option is used. <br /> Mining will begin in the southeast corner of the site and <br /> will continue, as shown on the Mining Plan Map, to the west and <br /> north. The Plant Site/stockpile area will start on the surface, <br /> but once bedrock is reached it will be moved to the floor of the <br /> mined area so it is screened below the surrounding areas . Map <br /> Exhibit C-1 shows how the site would look when the mine reaches full <br /> production. <br /> There will be 28 . 8 35 . 0 acres of bonded disturbanceed at <br /> any-one-time. Of this 35 . 028 . e acres, the processing/stockpile <br /> area will cover approximately 15. 0 acres, there will be 3 . 00 ± . 65 <br /> ac. stripped, and 3 . 95 5. 00 acres where active mining areas <br /> daile-and 12 acres of area being prepared for mining or partially <br /> reclaimed. The working face highwall will be ±s-1�fr8 1, 000 feet <br /> long with another 1, 000 ±66 feet being temporary graded to 2h to <br /> 1v. , <br /> The <br /> remaining highwall be kept at an interim grade of 2h to lv. The <br /> plan is to continue to mine into the gravel deposit at the mining <br /> face, working north south and west until the permit limits are <br /> reached. <br /> For Option 1 there will be a 25-foot digline setback <br /> maintained from the permit boundary so there is adequate space on <br /> the level above the slope for property line access, setback <br /> maintenance, grading and shaping. The setback from the house and <br /> school house will be 200 feet . If option 2 is used then the <br /> 9 (Revised 6/1/17) <br />