Laserfiche WebLink
site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Pad <br />12'X12'X1'th <br />Pavement, concrete, <br />5.33 <br />CY <br />$133.50 <br />$711.56 <br />demolition only, 7 in. <br />to 24 in. thick - <br />Reinforced <br />-Compressor <br />20'X20'X10' <br />Bldg. (SN) demo./on- <br />4,000.00 <br />CF <br />$0.22 <br />$860.00 <br />Building <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Equipment <br />20'X20'X10' <br />Bldg. (SN) demo./on- <br />2,000.00 <br />CF <br />$0.22 <br />$430.00 <br />Removal <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Pad <br />20'X20'X2' <br />Pavement, concrete, <br />27.00 <br />CY <br />$133.50 <br />$3,604.50 <br />demolition only, 7 in. <br />to 24 in. thick - <br />Reinforced <br />Refuse Substation <br />32'X17.5'X6' <br />Bldg. (SN) demo./on- <br />3,360.00 <br />CF <br />$0.22 <br />$722.40 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB Transformer <br />1.00 <br />EA <br />$2,238.20 <br />$2,238.20 <br />Transformer <br />Removal <br />Plant Substation <br />32'X17.5'X6' <br />Bldg. (SN) demo./on- <br />3,360.00 <br />CF <br />$0.22 <br />$722.40 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB Transformer <br />1.00 <br />EA <br />$2,238.20 <br />$2,238.20 <br />Transformer <br />Removal <br />East Portal <br />32'X17.5'X6' <br />Bldg. (SN) demo./on- <br />3,360.00 <br />CF <br />$0.22 <br />$722.40 <br />Substation <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB Transformer <br />1.00 <br />EA <br />$2,238.20 <br />$2,238.20 <br />Transformer <br />Removal <br />Thickener <br />15'DX12' <br />Bldg. (SN) demo./on- <br />2,120.00 <br />CF <br />$0.22 <br />$455.80 <br />Substation <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Pad <br />15'DX12" <br />Demo. and on -site <br />176.70 <br />SF <br />$2.00 <br />$353.75 <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />-Remove <br />NA <br />NON -PCB Transformer <br />1.00 <br />EA <br />$2,238.20 <br />$2,238.20 <br />Transformer <br />Removal <br />Electric House <br />91X91X10' <br />Bldg. (SN) demo./on- <br />810.00 <br />CF <br />$0.22 <br />$174.15 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Concrete Portion <br />7'X7'X5' <br />Bldg. (SC) demo./on- <br />245.00 <br />CF <br />$0.26 <br />$62.48 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Electric Power <br />96 CY <br />USER PROVIDED ITEM <br />96.00 <br />CY <br />$24.34 <br />$2,336.64 <br />Upgrade Equip. <br />Removal <br />