Laserfiche WebLink
Reinforced <br />Water Tank <br />21.5'X24' <br />Bldg. (SN) demo./on- <br />8,714.00 <br />CF <br />$0.22 <br />$1,873.51 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Footers <br />67.5 LF (5) <br />Demo. and on -site <br />338.00 <br />LF <br />$4.00 <br />$1,352.00 <br />disposal in existing pit, <br />1.0 ft. x 2 ft. - Max. <br />10,000 ft. haul <br />Emergency Escape <br />20'X20'X20' <br />Bldg. (SN) demo./on- <br />8,000.00 <br />CF <br />$0.22 <br />$1,720.00 <br />Hoist <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Prep Plant <br />78'X65'X82' <br />Bldg. (SN) demo./on- <br />415,740.00 <br />CF <br />$0.22 <br />$89,384.10 <br />site disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />-Pad <br />78'X65'X24" <br />Pavement, concrete, <br />376.00 <br />CY <br />$133.50 <br />$50,196.00 <br />demolition only, 7 in. <br />to 24 in. thick - <br />Reinforced <br />-Footers <br />2'X3' <br />Demo. and on -site <br />283.00 <br />LF <br />$12.01 <br />$3,398.83 <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />Thickener Tank <br />100'DX12' <br />Demo. and on -site <br />3,770.00 <br />SF <br />$2.00 <br />$7,547.54 <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />-Pad <br />100'DX12" <br />Pavement, concrete, <br />290.80 <br />CY <br />$133.50 <br />$38,821.80 <br />demolition only, 7 in. <br />to 24 in. thick - <br />Reinforced <br />Coal Silos (2) <br />70'X183'X3' <br />Explosive demolition, <br />1,408,600.00 <br />CF <br />$0.32 <br />$450,752.00 <br />(Each) <br />large projects - <br />Concrete structures <br />-Pad(2) <br />70'X24" (Each) <br />Pavement, concrete, <br />570.00 <br />CY <br />$133.50 <br />$76,095.00 <br />demolition only, 7 in. <br />to 24 in. thick - <br />Reinforced <br />-Footers <br />2'X3'X220 LF <br />Demo. and on -site <br />440.00 <br />LF <br />$12.01 <br />$5,284.40 <br />disposal in existing pit, <br />2.0 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />River Crossing <br />30' x 4'w x 3'h <br />Bridge Demolition - <br />120.00 <br />SF <br />$9.57 <br />$1,148.40 <br />Bridge (metal foot <br />Steel <br />bridge) <br />Slope Rail Track <br />1,325 LF <br />Railroad track - Ties <br />1,325.00 <br />LF <br />$9.98 <br />$13,223.50 <br />and track <br />-Fencing <br />500 LF <br />Fencing, chain link, <br />500.00 <br />LF <br />$3.08 <br />$1,540.00 <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />-Retaining Wall <br />3.5'X12"X150LF <br />Demo. and on -site <br />525.00 <br />SF <br />$3.77 <br />$1,979.25 <br />disposal in existing pit, <br />12 in. thick - Max. <br />10,000 ft. haul <br />Rock Dust Bin <br />5,000 CF <br />Bldg. (SN) demo./on- <br />5,000.00 <br />CF <br />$0.22 <br />$1,075.00 <br />