Reinforced
<br />Water Tank
<br />21.5'X24'
<br />Bldg. (SN) demo./on-
<br />8,714.00
<br />CF
<br />$0.22
<br />$1,873.51
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Footers
<br />67.5 LF (5)
<br />Demo. and on -site
<br />338.00
<br />LF
<br />$4.00
<br />$1,352.00
<br />disposal in existing pit,
<br />1.0 ft. x 2 ft. - Max.
<br />10,000 ft. haul
<br />Emergency Escape
<br />20'X20'X20'
<br />Bldg. (SN) demo./on-
<br />8,000.00
<br />CF
<br />$0.22
<br />$1,720.00
<br />Hoist
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />Prep Plant
<br />78'X65'X82'
<br />Bldg. (SN) demo./on-
<br />415,740.00
<br />CF
<br />$0.22
<br />$89,384.10
<br />site disposal in existing
<br />pit or cut - Max.
<br />10,000 ft. haul
<br />-Pad
<br />78'X65'X24"
<br />Pavement, concrete,
<br />376.00
<br />CY
<br />$133.50
<br />$50,196.00
<br />demolition only, 7 in.
<br />to 24 in. thick -
<br />Reinforced
<br />-Footers
<br />2'X3'
<br />Demo. and on -site
<br />283.00
<br />LF
<br />$12.01
<br />$3,398.83
<br />disposal in existing pit,
<br />2.0 ft. x 3 ft. - Max.
<br />10,000 ft. haul
<br />Thickener Tank
<br />100'DX12'
<br />Demo. and on -site
<br />3,770.00
<br />SF
<br />$2.00
<br />$7,547.54
<br />disposal in existing pit,
<br />12 in. thick - Max.
<br />10,000 ft. haul
<br />-Pad
<br />100'DX12"
<br />Pavement, concrete,
<br />290.80
<br />CY
<br />$133.50
<br />$38,821.80
<br />demolition only, 7 in.
<br />to 24 in. thick -
<br />Reinforced
<br />Coal Silos (2)
<br />70'X183'X3'
<br />Explosive demolition,
<br />1,408,600.00
<br />CF
<br />$0.32
<br />$450,752.00
<br />(Each)
<br />large projects -
<br />Concrete structures
<br />-Pad(2)
<br />70'X24" (Each)
<br />Pavement, concrete,
<br />570.00
<br />CY
<br />$133.50
<br />$76,095.00
<br />demolition only, 7 in.
<br />to 24 in. thick -
<br />Reinforced
<br />-Footers
<br />2'X3'X220 LF
<br />Demo. and on -site
<br />440.00
<br />LF
<br />$12.01
<br />$5,284.40
<br />disposal in existing pit,
<br />2.0 ft. x 3 ft. - Max.
<br />10,000 ft. haul
<br />River Crossing
<br />30' x 4'w x 3'h
<br />Bridge Demolition -
<br />120.00
<br />SF
<br />$9.57
<br />$1,148.40
<br />Bridge (metal foot
<br />Steel
<br />bridge)
<br />Slope Rail Track
<br />1,325 LF
<br />Railroad track - Ties
<br />1,325.00
<br />LF
<br />$9.98
<br />$13,223.50
<br />and track
<br />-Fencing
<br />500 LF
<br />Fencing, chain link,
<br />500.00
<br />LF
<br />$3.08
<br />$1,540.00
<br />including posts and
<br />fabric - 8 ft. to 10 ft.
<br />high
<br />-Retaining Wall
<br />3.5'X12"X150LF
<br />Demo. and on -site
<br />525.00
<br />SF
<br />$3.77
<br />$1,979.25
<br />disposal in existing pit,
<br />12 in. thick - Max.
<br />10,000 ft. haul
<br />Rock Dust Bin
<br />5,000 CF
<br />Bldg. (SN) demo./on-
<br />5,000.00
<br />CF
<br />$0.22
<br />$1,075.00
<br />
|