Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil on NW vent Fan Area (TR72) <br />Site: New Elk Mine Permit Action: Mid Term 08 Permit/Job#: I C1981012 <br />PROJECT IDENTIFICATION <br />Task #: <br />027 <br />State: <br />Colorado <br />Abbreviation: <br />None <br />Date: <br />8/5/2021 <br />County: <br />Las Animas <br />Filename: <br />C012-027 <br />User: <br />DC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: CAT 928Hz <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />Cat D8T - 8SU <br />NA <br />NA <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />45 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$18.14 <br />$30.09 <br />NA <br />$97.46 <br />NA <br />NA <br />Operating cost/hour: <br />$35.95 <br />$13.44 <br />NA <br />$97.63 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$40.71 <br />NA <br />$41.30 <br />NA <br />NA <br />Unit Subtotals: <br />$54.09 <br />$84.24 <br />NA <br />$236.39 <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $138.33 <br />Support: $236.39 <br />Maint: $0.00 <br />Total work team cost/hour: $374.72 <br />MATERIAL QUANTITIES <br />Initial volume: 694 <br />Loose volume: 843 <br />Source of estimated volume <br />Source of estimated swell factor <br />Material Purchase Cost <br />Total Cost <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />CCY Swell factor: 1.215 <br />LCY <br />Division of Reclamation, Mining & Sa <br />Cat Handbook <br />$0.00 <br />$0.00 <br />