Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(off) <br />(off) <br />(fpm) <br />Time <br />(min) <br />1 <br />5000.00 <br />5.00 <br />4.00 <br />9.00 <br />1249 <br />4.024 <br />Haul Time: 1 4.024 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(off) <br />(off) <br />(fpm) <br />Time <br />(min) <br />1 <br />5000.00 <br />-5.00 <br />4.00 <br />-1.00 <br />2938 <br />1.754 <br />Return Time: 1.754 minutes <br />Total Truck Cvcle Time: 8.348 minutes <br />Loading Tool unit <br />Production <br />298.78 <br />LCY/Hour <br />Adjusted for job efficiency: <br />247.99 <br />LCY/Hour <br />Truck Unit Production <br />63.35 <br />LCY/Hour <br />Adjusted for job efficiency: <br />52.58 <br />LCY/Hour <br />Optimal No. of Trucks: <br />5 <br />Truck(s) <br />Selected Number of Trucks: <br />3 <br />Truck(s) <br />Adjusted hourly truck team production: <br />157.74 <br />LCY/Hour <br />Adjusted single truck/loader team production: <br />157.74 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: <br />157.74 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) <br />Total job time: <br />121.05 Hours <br />Unit cost: <br />$5.499 <br />/LCY <br />Total job cost: <br />$105,007 <br />