Laserfiche WebLink
-plug <br />PVC plug - 8 in. <br />9" <br />NA <br />1.00 <br />EA <br />$84.15 <br />$84.15 <br />diameter borehole <br />-marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$37.50 <br />$37.50 <br />location/identification <br />marker (EA, material <br />cost only) <br />-Rig and labor <br />Altas Capco DM25SP - <br />NA <br />NA <br />4.00 <br />EA <br />$585.95 <br />$2,343.80 <br />6-3/4" <br />-water truck time <br />Water Tanker, 2,500 <br />NA <br />NA <br />4.00 <br />EA <br />$29.70 <br />$118.80 <br />Gal. <br />Plug 6 <br />Portland cement grout ( <br />6" <br />2270 <br />223.00 <br />bag <br />$19.95 <br />$4,448.85 <br />"exploration" <br />Bag, material cost <br />wells (MR114) <br />only ... 94 lb. bag) <br />-plugs <br />PVC plug - 6 in. <br />6" <br />NA <br />6.00 <br />EA <br />$61.43 <br />$368.58 <br />diameter borehole <br />-drill rig and labor <br />Altas Capco DM25SP - <br />NA <br />NA <br />36.00 <br />EA <br />$585.95 <br />$21,094.20 <br />6-3/4" <br />-water truck time <br />Water Tanker, 2,500 <br />NA <br />NA <br />36.00 <br />EA <br />$29.70 <br />$1,069.20 <br />Gal. <br />Seal NE01-12, <br />Portland cement grout ( <br />6" <br />2500 <br />245.00 <br />bag <br />$19.95 <br />$4,887.75 <br />NE17-12, NE18-12 <br />Bag, material cost <br />(MR107) <br />only ... 94 lb. bag) <br />-plug <br />PVC plug - 6 in. <br />6" <br />NA <br />3.00 <br />EA <br />$61.43 <br />$184.29 <br />diameter borehole <br />-Mark holes <br />Borehole <br />NA <br />NA <br />3.00 <br />EA <br />$37.50 <br />$112.50 <br />location/identification <br />marker (EA, material <br />cost only) <br />-Rig and Labor <br />Altas Capco DM25SP - <br />NA <br />NA <br />6.00 <br />EA <br />$585.95 <br />$3,515.70 <br />6-3/4" <br />-water truck time <br />Water Tanker, 2,500 <br />NA <br />NA <br />8.00 <br />EA <br />$29.70 <br />$237.60 <br />Gal. <br />Seal 2 alluvial <br />Portland cement grout ( <br />4" <br />60 <br />2.62 <br />bag <br />$19.95 <br />$52.27 <br />wells (MR116) <br />Bag, material cost <br />only ... 94 lb. bag) <br />-marker <br />Borehole <br />NA <br />NA <br />2.00 <br />EA <br />$37.50 <br />$75.00 <br />location/identification <br />marker (EA, material <br />cost only) <br />-labor <br />General laborer- <br />na <br />na <br />2.00 <br />HR <br />$23.53 <br />$47.06 <br />Colorado (total incl. <br />fringes, empl. burden) <br />Plug and Seal NE- <br />Portland cement grout ( <br />9" <br />5200 <br />1,148.00 <br />bag <br />$19.95 <br />$22,902.60 <br />05-11 (4wells) <br />Bag, material cost <br />and 08-11(4 <br />only ... 94 lb. bag) <br />wells) <br />-marker <br />Borehole <br />NA <br />NA <br />8.00 <br />EA <br />$37.50 <br />$300.00 <br />location/identification <br />marker (EA, material <br />cost only) <br />-cut casing <br />Exposed casing removal <br />9" <br />72 <br />8.00 <br />LF <br />$3.26 <br />$26.08 <br />- Calculate <br />Circumference in Linear <br />Feet <br />-rig and labor <br />Atlas Capco DM45/HP - <br />NA <br />NA <br />45.00 <br />EA <br />$561.88 <br />$25,284.60 <br />9.0" <br />-water tanker <br />Water Tanker, 2,500 <br />NA <br />NA <br />45.00 <br />EA <br />$29.70 <br />$1,336.50 <br />Gal. <br />