Laserfiche WebLink
Circumference in Linear <br />Feet <br />-Borehole <br />Borehole <br />NA <br />NA <br />3.00 <br />EA <br />$37.50 <br />$112.50 <br />Markers <br />location/identification <br />marker (EA, material <br />cost only) <br />-Drill Rig Time <br />SCHRAMM T450WS <br />NA <br />NA <br />18.00 <br />EA <br />$501.24 <br />$9,022.32 <br />-Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />18.00 <br />EA <br />$29.70 <br />$534.60 <br />Time <br />Gal. <br />RW1 & SW1- <br />Portland cement grout ( <br />4" <br />161 LF <br />7.00 <br />bag <br />$19.95 <br />$139.65 <br />SW6 Fill <br />Bag, material cost <br />w/Cement <br />only ... 94 lb. bag) <br />-Plug <br />PVC plug - 4 in. <br />4" <br />NA <br />7.00 <br />EA <br />$33.98 <br />$237.86 <br />diameter borehole <br />-Cut Casing at <br />Exposed casing removal <br />4" <br />NA <br />4.00 <br />LF <br />$3.26 <br />$13.04 <br />Surface <br />- Calculate <br />Circumference in Linear <br />Feet <br />-Borehole Marker <br />Borehole <br />NA <br />NA <br />7.00 <br />EA <br />$37.50 <br />$262.50 <br />location/identification <br />marker (EA, material <br />cost only) <br />-Drill Rig Time <br />SCHRAMM T450WS <br />NA <br />NA <br />14.00 <br />EA <br />$501.24 <br />$7,017.36 <br />-Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />14.00 <br />EA <br />$29.70 <br />$415.80 <br />Time <br />Gal. <br />Dewatering Holes <br />Portland cement grout ( <br />4" <br />450 <br />19.00 <br />bag <br />$19.95 <br />$379.05 <br />Fill w/Cement <br />Bag, material cost <br />only ... 94 lb. bag) <br />-Plug <br />PVC plug - 4 in. <br />4" <br />NA <br />2.00 <br />EA <br />$33.98 <br />$67.96 <br />diameter borehole <br />-Cut Casing at <br />Exposed casing removal <br />4" <br />NA <br />4.00 <br />LF <br />$3.26 <br />$13.04 <br />Surface <br />- Calculate <br />Circumference in Linear <br />Feet <br />-Borehole Marker <br />Borehole <br />NA <br />NA <br />2.00 <br />EA <br />$37.50 <br />$75.00 <br />location/identification <br />marker (EA, material <br />cost only) <br />-Drill Rig Time <br />SCHRAMM T450WS <br />NA <br />NA <br />10.00 <br />EA <br />$501.24 <br />$5,012.40 <br />-Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />10.00 <br />EA <br />$29.70 <br />$297.00 <br />Time <br />Gal. <br />Seal 3 Slurry wells <br />Portland cement grout ( <br />9" <br />1350 <br />298.00 <br />bag <br />$19.95 <br />$5,945.10 <br />( MR95) <br />Bag, material cost <br />only ... 94 lb. bag) <br />-Drill rig and labor <br />Atlas Capco DM45/HP - <br />NA <br />NA <br />12.00 <br />EA <br />$561.88 <br />$6,742.56 <br />9.0" <br />-Water Truck time <br />Water Tanker, 2,500 <br />na <br />na <br />12.00 <br />EA <br />$29.70 <br />$356.40 <br />Gal. <br />-slurry well plugs <br />PVC plug - 8 in. <br />9" <br />NA <br />3.00 <br />EA <br />$84.15 <br />$252.45 <br />diameter borehole <br />-slurry hole <br />Borehole <br />NA <br />NA <br />3.00 <br />EA <br />$37.50 <br />$112.50 <br />markers <br />location/identification <br />marker (EA, material <br />cost only) <br />Seal NE-16-11 <br />Portland cement grout ( <br />9" <br />392 <br />86.00 <br />bag <br />$19.95 <br />$1,715.70 <br />(MR96) <br />Bag, material cost <br />only ... 94 lb. bag) <br />