Laserfiche WebLink
Task Description: Backfill highwalls 3H:1V Task# OO1C <br /> Site: Golden Mine <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: C730 Truck CAT 950 Loader CatD8 Dozer 2500 gallon water truck <br /> Unit Cost/Hour: $ 129.72 $ 95.37 $ 191.83 $ 57.56 <br /> Unit Production: 18.06 LCY <br /> 108.36 LCY/Hr 528.59 LCY/Hr <br /> MATERIAL QUANTITIES <br /> Initial volume: 1,583 <br /> Swell factor: 1.125 <br /> Loose volume: 1,781 <br /> TRAVELTIME <br /> Haul distance 2000 ft <br /> Total cycle time 10 minutes <br /> JOB TIME AND COST <br /> Fleet size: 1 truck,1 loader, 1 dozer,1 water truck <br /> Total job time: 16.43 <br /> Fleet cost/hour 474.48 <br /> Total job cost: $ 7,797.98 <br />