Laserfiche WebLink
Task Description: Rip Haul Road Task# 002 <br /> Site: Golden Mine <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8 with 3-shank ripper <br /> Horsepower: 310 <br /> Unit Cost/Hour: $ 208.90 <br /> MATERIAL QUANTITIES <br /> Area: 0.41 acres <br /> Rip depth 0.5 feet <br /> Volume: 3,146 CY <br /> Unit production: 0.75 acre/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 dozer <br /> Unit cost: $ 278.53 <br /> Total job time: 0.55 <br /> Total job cost: $ 114.20 <br />