Laserfiche WebLink
Mill <br /> Task Description: Mobilize/Demobilize Task# 012 <br /> Site: Golden Mine <br /> EQUIPMENT TRANSPORT RIG COST <br /> Rig Capacities: 0-25 Tons 26-50 tons 51+tons <br /> Unit Cost: $ 88.67 $ 117.55 $ 125.45 <br /> NON ROADABLE EQUIPMENT <br /> Haul trip Return Trip DOT Permit <br /> Machine Weight/Tons cost/hr/fleet cost/hr/fleet cost/fleet <br /> CAT D8 53.08 $ 205.64 $ 125.45 $ 250.00 <br /> CAT 12M 16.01 $ 112.15 $ 88.67 $ 250.00 <br /> CAT 950 20.13 $ 184.07 $ 88.67 $ 250.00 <br /> Drill/Broadcast <br /> seeder with tractor 25 $ 128.26 $ 88.67 $ - <br /> Subtotall $ 630.12 1 $ 391.46 1 $ 750.00 <br /> ROADABLE EQUIPMENT <br /> 2500 gallon water truck $ 68.18 $ 68.18 <br /> Fuel tanker $ 81.14 $ 81.14 <br /> Lube truck $ 94.90 $ 94.90 <br /> Flatbed truck $ 115.89 $ 115.89 <br /> Subtotall $ 360.11 1 $ 360.11 <br /> EQUIMENT HAUL DISTANCE AND TIME <br /> Golden 10 miles one-way <br /> Average speed 40 mph <br /> Transportion Cycle Time Hours <br /> Non-Roadable Roadable <br /> Haul time: 0.5 0.5 <br /> Return time: 0.5 0.5 <br /> Loading time: 0.5 NA <br /> Unloading time: 0.5 NA <br /> Su btota Is: 21 1 <br /> Total Non-Roadable Cost: $ 1,665.18 <br /> Total Roadable Cost: $ 360.11 <br /> JOB TIME AND COST <br /> Total time: 4 <br /> Total cost: $ 5,550.57 <br />