Laserfiche WebLink
COST SUMMARY WORK <br /> Task Description: Reclamation cost estimate <br /> Site: Golden Mine <br /> TASK LIST(Direct costs) <br /> TASK Description Task Hours Cost <br /> OO1C Backfill highwalls 3H:1V 16.43 $ 7,797.98 <br /> 002 Rip processing area 0.55 $ 114.20 <br /> 003 Contour and pushdown overburden piles 3.79 $ 790.84 <br /> 005 Finish grade disturbed area 46.86 $ 4,492.66 <br /> 006 Distribute topsoil over affected areas 96.02 $ 40,030.79 <br /> O10 IReseed facilities area and haul road 131.2 $ 189,711.26 <br /> 012 IMobilize and demobilize 4 $ 5,550.57 <br /> Hours Total: 298.84 <br /> Direct Costs Total: $ 248,488.30 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability insurance: 2.02% $ 5,019.46 <br /> Performance bond: 1.05% $ 2,683.67 <br /> Job superintendent 100 $ 7,500.00 <br /> Profit: 5% $ 12,424.42 <br /> CONTRACT AMOUNT(DIRECT AND O&P) $ 276,115.86 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT <br /> Engineering work and/or contract/bid preparation 0.00% $ - <br /> Reclamation management and/or administration 4.50% $ 12,425.21 <br /> TOTAL BOND AMOUNT $ 288,541.07 <br />