My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-19_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-08-19_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 6:48:12 AM
Creation date
8/23/2021 5:31:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
8/19/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Type & Sequence
TR16
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AFL INDUSTRIES,INC. <br /> RIVIERA BEACH,FLORIDA <br /> SERVICE GENERAL Page 2 OF 3 <br /> MANUAL INSTRUCTIONS <br /> PRODUCT: SEPARATORS <br /> RECEIVING MATERIAL <br /> The equipment pieces and components you receive may have been shipped from: <br /> 1. The AFL Industries factory in Riviera Beach,Florida; <br /> 2. A fabricator acting under AFL instruction; <br /> 3. A buy-out distributor,such as a motor or pump manufacturer. <br /> Since there may be more than one shipment to the job site,it is important to coordinate the receiving and storage of the goods <br /> accordingly. <br /> Upon receipt of a shipment,you should immediately check goods received. If you find that certain items are missing,make a note <br /> of this on the shipping papers to protect your interests. Also, IMMEDIATELY notify AFL Industries of this shortage. <br /> All material has been thoroughly checked and inspected before shipment. If the equipment is received in bad condition or if the <br /> packages are broken,make a"bad order" notation on the shipping papers to this effect. THIS PROTECTS YOU since it will <br /> enable you to place the proper claims against the freight company. Notify proper authorities IMMEDIATELY if any parts are <br /> found broken or damaged during shipment. <br /> Please handle the equipment properly when unloading and erecting. All cartons,electrical equipment,and gear drives,shipped <br /> separately or mounted on tank,should be stored under cover and protected from moisture,grit,and mud. AFL Industries will not <br /> be responsible for material deterioration due to improper handling,exposure,or inadequate protection during storage. <br /> PROCEDURE FOR ORDERING SPARE OR REPAIR PARTS <br /> 1. Identify your equipment using the AFL or Engineer's contract number shown on equipment specification sheets. <br /> 2. Identify the part by name and give the number of the drawing on which this part or assembly appears. If it is a part for a <br /> motor, pump, electrical control or any part not manufactured by AFL, the information will be found in the manufacturer's <br /> reference data included in this brochure,or on the manufacturer's nameplate. <br /> 3. Show the part number. (Information can be gained in the same manner.) <br /> 4. Show the size, and include all pertinent dimensions (such as diameter, length, thickness, bore, pitch, etc.) whenever <br /> possible. <br /> 5. If parts being ordered are electrical in nature,give all pertinent data: Voltage,amperage,wattage,cycle,speed power factor <br /> or other information given on a nameplate or in the brochure. <br /> 6. Submit your written purchase order or request for quotation,both signing and printing your full name so that we will know <br /> whom to contact should further clarification of the order be necessary. ALL VERBAL ORDERS MUST BE <br /> CONFIRMED IN WRITING. <br /> 7. Give return address,and shipping address. <br /> SUPERSEDES: I-O-M: 0.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.