My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-19_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-08-19_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 6:48:12 AM
Creation date
8/23/2021 5:31:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
8/19/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Type & Sequence
TR16
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AFL INDUSTRIES,INC. <br /> RIVIERA BEACH, FLORIDA <br /> SERVICE GENERAL Page 1 OF 3 <br /> MANUAL INSTRUCTIONS <br /> PRODUCT: SEPARATORS <br /> CONTRACTOR-PLEASE READ THIS <br /> INSTRUCTION CAREFULLY <br /> AFL Industries provides you with several valuable aids,and the few minutes you spend reading this instruction will save you <br /> hours later. The purpose of this instruction is to acquaint you with the equipment-erecting knowledge which you now have at your <br /> fingertips. <br /> THE INFORMATION CONTAINED IN THESE INSTRUCTIONS IS BASED ON YEARS OF EXPERIENCE WITH THE <br /> ERECTION OF OUR EQUIPMENT,BUT IS INTENDED AS A GUIDE ONLY. THE EQUIPMENT WHICH YOU HAVE <br /> AVAILABLE TO YOU MAY DICTATE OTHER, MORE CONVENIENT, PROCEDURES, BUT THE FINAL <br /> RESPONSIBILITY FOR SELECTION OF ERECTION PROCEDURES OR TOOLS IS NOT BORNE BY AFL INDUSTRIES, <br /> INC. <br /> IOM BROCHURE <br /> This brochure contains the heart of the information necessary to erect the equipment. It is structured as follows: <br /> 1. Title Page and General Instructions; <br /> 2. Table of Contents- listing of descriptions and reference numbers for all drawings; <br /> 3. Specific Contract Information. <br /> The complete section of information provided for each contract includes: <br /> 1. Contract Equipment Specification-a written description of the equipment; <br /> 2. Installation Instructions-a general erection instruction for the equipment provided; <br /> 3. Assembly Drawings-showing the unit and its various components; <br /> 4. Operation and Maintenance Instructions; <br /> 5. Spare Parts Lists; <br /> 6. Information on our buy-out items (pumps, motors, etc.), certified prints, special operation and maintenance <br /> instructions. <br /> SUPERSEDES: I-O-M: 0.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.