Laserfiche WebLink
P.O. Box 326. Canon City. CO 81215 <br /> i angela@eiivalternatives.com <br /> L Environmental 719-275-8951 <br /> L Alternatives, <br /> 11L Inc. <br /> RECE ED <br /> AUG 19 2021 <br /> August 10, 2021 <br /> DIVISION OF RECLWATION <br /> Peter Hays MINING AND SAFETY <br /> Division of Reclamation Mining and Safety <br /> 1313 Sherman Street, Room 213 <br /> Denver, CO 80203 <br /> RE: M-2021-007 Salisbury Gladstone LLC, Gladstone Toll Mill <br /> Response to Adequacy Review dated July 19, 2021 <br /> Dear Mr. Hays, <br /> Please accept this correspondence as response to the Adequacy Review dated July 19, 2021. <br /> Item 3:The applicant commits to complying with the CO DWR comments regarding obtaining a <br /> substitute water supply plan in the event water quality standards cannot be met. The applicant <br /> commits to notifying CO History in the event human remains are discovered during ground <br /> disturbing activities. <br /> Item 5: The cover letter dated February 1, 2021 states that the byproducts will be used in the <br /> construction industry as concrete sand or utility installation backfill material,to name two <br /> possibilities. Concrete sand was one example of an end use but not the only end use. <br /> As stated in Exhibit F: Toll Milling Agreement, the applicant does not take possession of the <br /> feedstock material but rather is the processor only. The concrete plant operators will enter into <br /> contract with the feedstock material owner upon determination that the byproduct meets ASTM <br /> C33-03 specifications. ASTM C33-03 will be performed on the byproduct material, of which there is <br /> none at this time, as it is produced or any other standard/sieve test at the expense of the owner at <br /> the direction of the end user. <br /> Byproduct end use will be tracked using traditional chain-of-custody (COC) and/or scale(load)tickets <br /> typical of the transportation industry. The COC or scale(load)ticket will include the byproduct <br /> owner, quantity and final destination. <br /> Item 6: Please find the revised Exhibit B. <br />