Laserfiche WebLink
ROADABLE EQUIPMENT <br /> Machine Description: Total Cost/hr/unit Fleet size Haul Trip Return Trip <br /> Drill/Broadcast Seeder Cost/Hr/Fl Cost/Hr/Fl <br /> With Tractor $62.35 1 $62.35 $62.35 <br /> Power Mulcher $30.67 1 $30.67 $30.67 <br /> Subtotals: $93.02 $93.02 <br /> Subtotal—Roadable Equipment Transport Cost $93.02 x 2 = $186.04 <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest Major City or Town within project area... Canon City <br /> Total one way travel distance 3 miles <br /> Average Travel Speed 30mph <br /> Total Non-Roadable Mob/Demob Cost $1440.90 <br /> Total Roadable Mob/Demob Cost $186.04 <br /> Transportation Cycle Time: <br /> Non-Roadable Equipment Roadable Equipment <br /> Haul Time (hours) 0.10 0.10 <br /> Return Time (hours) 0.10 0.10 <br /> Loading Time (hours) 0.25 na <br /> Unloading Time (hours) 0.25 na <br /> Subtotals: 0.70 0.20 <br /> JOB TIME AND COST <br /> Total Job Time: 1.4 hours <br /> Total Job Cost: $1440.90 + $186.04 = $1,626.94 <br /> 15 <br />