My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-10_REVISION - M1977193
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2021-08-10_REVISION - M1977193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 1:19:44 PM
Creation date
8/11/2021 6:01:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Revision
Doc Date
8/10/2021
Doc Name
Request for Technical Revision
From
Tezak Heavy Equipment
To
DRMS
Type & Sequence
TR10
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT <br /> Machine Description: Total Cost/hr/unit Fleet size Haul Trip Return Trip <br /> Drill/Broadcast Seeder Cost/Hr/Fl Cost/Hr/Fl <br /> With Tractor $62.35 1 $62.35 $62.35 <br /> Power Mulcher $30.67 1 $30.67 $30.67 <br /> Subtotals: $93.02 $93.02 <br /> Subtotal—Roadable Equipment Transport Cost $93.02 x 2 = $186.04 <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest Major City or Town within project area... Canon City <br /> Total one way travel distance 3 miles <br /> Average Travel Speed 30mph <br /> Total Non-Roadable Mob/Demob Cost $1440.90 <br /> Total Roadable Mob/Demob Cost $186.04 <br /> Transportation Cycle Time: <br /> Non-Roadable Equipment Roadable Equipment <br /> Haul Time (hours) 0.10 0.10 <br /> Return Time (hours) 0.10 0.10 <br /> Loading Time (hours) 0.25 na <br /> Unloading Time (hours) 0.25 na <br /> Subtotals: 0.70 0.20 <br /> JOB TIME AND COST <br /> Total Job Time: 1.4 hours <br /> Total Job Cost: $1440.90 + $186.04 = $1,626.94 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.