Laserfiche WebLink
Job Condition Correction Factors: <br /> Unadjusted Hourly Unit Production: 0.747 acres/hour <br /> Site Altitude Adj. 1.0 <br /> Job Efficiency Adj. 0.83 <br /> Adjusted Hourly Production: 0.62 Acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 <br /> Unit Cost: $505.27/acre <br /> Total job time: 123.3 acres/ .62 acres/hour= 198.87 hours <br /> Total Job Cost 198.87 Hrs. x $206.50/Hr. $41,066.66 <br /> 8 <br />