My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-10_REVISION - M1977193
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2021-08-10_REVISION - M1977193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 1:19:44 PM
Creation date
8/11/2021 6:01:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Revision
Doc Date
8/10/2021
Doc Name
Request for Technical Revision
From
Tezak Heavy Equipment
To
DRMS
Type & Sequence
TR10
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task Description: Rip Phase 1 Disturbed area, fines storage structure, road easements <br /> 123.3 acres total. <br /> PROJECT IDENTIFICATION <br /> Task#: 130 <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series 11 <br /> Ripper Attach 3 shank ripper <br /> Ownership Cost/Hour $81.02 <br /> Operating Cost/Hour $79.33 <br /> Ripper Own& Oper Cost/Hour $15.25 <br /> Operating Cost/Hour $30.90 <br /> Total Unit Cost/Hour $206.50 <br /> MATERIAL QUANTITIES <br /> Area: 123.3 <br /> Seismic: NA <br /> Bank Volume: NA <br /> Rip Depth(ft.) 1.00 <br /> BCY NA <br /> Volume: 198,924 BCY <br /> HOURLY PRODUCTION <br /> Area: <br /> Average Ripping Speed: 2.45 mph <br /> Average Ripping Width: 6.50 feet <br /> Average Ripping Length: 400 feet <br /> Average Dozer Speed: 88 fpm <br /> Average Maneuver Time: .25 minutes <br /> Production per unit area: 0.747 acres/hour <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.