Laserfiche WebLink
Design Report <br /> Goose Haven Reservoir Cell 2A <br /> May 14, 2021 <br /> Page 2 of 2 <br /> To date, Brierley has observed very little work that has been performed. For the work to be <br /> performed above existing grade, and for the auger bore drive associated with the project, Brierley <br /> plans the following actions in accordance with Rule 8 of the 2020 Rules and Regulations for Dam <br /> Safety and Dam Construction. This report is conditioned on Brierley being engaged to perform <br /> and Brierley performing the actions listed below. <br /> • Develop a Construction Observation Plan <br /> • Conduct a Pre-Construction Meeting <br /> • Observe the progress and quality of the construction in accordance with the approved <br /> Construction Observation Plan <br /> • Maintain a record of construction that, as a minimum, shall include daily activity and <br /> progress reports, design change orders, all materials testing results, gate and valve <br /> installation certifications, and documentation of any construction problems and remedies <br /> • Issue progress reports summarizing the status of the work to the State Engineer during <br /> the project <br /> • Notify the State Engineer in advance of milestones listed by the State Engineer in the pre- <br /> construction meeting <br /> • Issue change orders to the State Engineer when unforeseen site conditions or material <br /> availability require that the construction work differ significantly from the approved plans <br /> and specifications <br /> We appreciate the opportunity to work with you on this project. <br /> Sincerely, <br /> BRIERLEY ASSOCIATES <br /> o�p,o0 Up <br /> c,� •' p,6 E��•' sFa <br /> :4Z� 5/14/2021-7 <br /> 57505/ " <br /> Mohamed Gamal Abdel-Maksoud, PhD, PE Russell Berends, PE <br /> Principal Senior Design Engineer <br /> BRIERLEY <br /> ASSOCIATES <br /> Creating Space Underground <br />