Laserfiche WebLink
McAtee Construction Company . Page 2 <br /> Riverside Pit Partial Release M-1976-056 <br /> e <br /> RELEASE NOTES <br /> Revised Mininq Timetable (2021 release) <br /> ACRES <br /> PHASE YEARS MINED MINING SLOPE <br /> 100% AREA <br /> Lake Robert 3-5 17 . 27 8 . 28 8 . 99 <br /> Lake Marjorie 3-5 15 . 49 6 . 65 8 . 84 <br /> West Lake 7-10 19 . 80 9 . 12 10 . 68 <br /> East Lake 7-10 19 . 29 9 . 23 10 . 06 <br /> TOTALS 71 . 85 33 . 28 38 . 57 <br /> Revised Reclamation Timetable (2021 release) <br /> The Timetable reflects the areas shown on the new maps in <br /> this amendment . <br /> ACRES ± <br /> PHASE YEARS TOTAL WATER ROAD REVEG LAKE BACK DITCH INDUSTRIAL/ <br /> BOTTOM SLOPE AREA* MISC. ** <br /> BELOW <br /> WATER <br /> Lake Marjorie 4-6 26. 14 15.00 0.70 6.24 6. 65 8.35 1.02 3.18 <br /> Lake Robert 4-6 22.72 5.10 0. 951 8. 90 3.04 2.06 1.02 1.75 <br /> West Lake 4-6 26.851 18.18 0. 00 5.351 9. 121 9. 061 0.001 3.32 <br /> East Lake 4-6 26.861 19.29 1. 021 5. 691 9.231 10.061 0.001 1.86 <br /> TOTALS 1 102 .57 57.5-71 2. 671 26.181 28.041 29.531 2. 04 10. 11 <br /> * Ditch area in old area will not be disturbed. <br /> ** Asphalt Plant, Concrete Plant & Parking Area <br />