My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-19_PERMIT FILE - M1987131
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1987131
>
2021-07-19_PERMIT FILE - M1987131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 4:49:51 AM
Creation date
7/20/2021 6:33:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987131
IBM Index Class Name
PERMIT FILE
Doc Date
7/19/2021
Doc Name
Adequacy Review Response
From
ARY Corp.
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h) The primary and secondary commodities that is being mined is gravel and aggregate for <br /> construction materials. <br /> i) The intended use of all expected incidental products to be mined/ extracted will be to <br /> backfill affected areas for reclamation. <br /> j) There will be no use of explosives or blasting during the life of the mine. <br /> k) The haul road that will be used during the operation is 30 feet wide. One additional <br /> access road will be constructed to cross Eight Mile Creek in order to reach Phases 5-7. It <br /> will be a Texas-style crossing and reclaimed following all mining operations. The <br /> approximate location is denoted on the Phase Map. Additionally, the "pinch point" <br /> along the Fountain Hills Land & Equipment property will be mined from the west moving <br /> east until equipment can no longer maneuver in the site. Operations will cease at that <br /> location and move to the next phase. <br />