Laserfiche WebLink
h) The primary and secondary commodities that is being mined is gravel and aggregate for <br /> construction materials. <br /> i) The intended use of all expected incidental products to be mined/ extracted will be to <br /> backfill affected areas for reclamation. <br /> j) There will be no use of explosives or blasting during the life of the mine. <br /> k) The haul road that will be used during the operation is 30 feet wide. One additional <br /> access road will be constructed to cross Eight Mile Creek in order to reach Phases 5-7. It <br /> will be a Texas-style crossing and reclaimed following all mining operations. The <br /> approximate location is denoted on the Phase Map. Additionally, the "pinch point" <br /> along the Fountain Hills Land & Equipment property will be mined from the west moving <br /> east until equipment can no longer maneuver in the site. Operations will cease at that <br /> location and move to the next phase. <br />