Laserfiche WebLink
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2 —VIMA Partners, LLC <br /> (f) A description of each of the following: <br /> (i) Final grading - specify maximum anticipated slope gradient or expected ranges <br /> thereof; <br /> The maximum slopes that will be outside of the reservoir coverage are <br /> planned to be 3:1 or flatter for the banks of the proposed reservoir. <br /> (ii) Seeding - specify types, mixtures, quantities, and expected time(s) of seeding and <br /> planting; <br /> Seeding and mulching to follow the recommendations as set forth in the Mile <br /> High Flood District Criteria Manual. <br /> Clean, weed-free and seed-free cereal grain straw will be applied evenly at a <br /> rate of 2 tons per acre and will be tacked or fastened by a method suitable <br /> for the condition of the site. Straw mulch will be anchored on the surface <br /> mechanically by crimping. <br /> Expected time(s) of seeding and planting will occur during Spring or Fall. <br /> (iv) Fertilization - if applicable, specify types, mixtures, quantities and time of <br /> application; <br /> Soil amendments to be added if deemed necessary and will be applied at the <br /> time of seeding. <br /> (v) Revegetation - specify types of trees, shrubs, etc., quantities, size and location; <br /> and <br /> No trees or shrubs will be used. <br /> (vi) Topsoiling - specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced <br /> Approximately 4" of new topsoil will be used to re-establish vegetation as <br /> needed along the banks of the reservoir, assuming the existing soil isn't <br /> suitable for native plant growth. <br /> Reclamation Plan — <br /> The reclamation plan is to turn the site into a reservoir to support the non potable <br /> water system of the Raindance subdivision to the north. The reservoir will fill around 44 <br /> acres of surface area at its highest point, roughly 1500 acre-ft of water, and around 11 <br /> additional acres will be vegetated in the surrounding areas of the reservoir. The majority <br /> j5T.INC.CONSULTING ENGINEERS <br />