My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-19_PERMIT FILE - M2021049 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021049
>
2021-07-19_PERMIT FILE - M2021049 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 4:38:58 AM
Creation date
7/20/2021 6:19:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021049
IBM Index Class Name
PERMIT FILE
Doc Date
7/19/2021
Doc Name
Application
From
VIMA Partners, LLC
To
DRMS
Email Name
PSH
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2 —VIMA Partners, LLC <br /> Excavated sandy clay borrow material is being used for the 1-25 expansion project <br /> by CDOT.Additionally,some of the sandy clay borrow material will be used for other <br /> projects as needed. <br /> (h) name and describe the intended use of all expected incidental products to be <br /> mined/extracted by the proposed operation. <br /> None <br /> (i) Specify if explosives will be used in conjunction with the mining (or reclamation). In <br /> consultation with the Office, the Applicant must demonstrate pursuant to Rule 6.5(4), <br /> Geotechnical Stability Exhibit, that off-site areas will not be adversely affected by <br /> blasting. <br /> None <br /> Q) Specify the dimensions of any existing or proposed roads that will be used for the mining <br /> operation. Describe any improvements necessary on existing roads and the <br /> specifications to be used in the construction of new roads. New or improved roads must <br /> be included as part of the affected lands and permitted acreage. Affected land shall not <br /> include off-site roads which existed prior to the date on which notice was given or permit <br /> application was made to the office and which were constructed for purposes unrelated to <br /> the proposed mining operation and which will not be substantially upgraded to support <br /> the mining operation. Describe any associated drainage and runoff conveyance <br /> structures to include sufficient information to evaluate structure sizing. <br /> WCR 62 is an existing 4 lane rural arterial roadway with a width of 60-feet. <br /> There are no improvements necessary to the existing roadways for this mining <br /> operation. <br /> Mining Plan — <br /> The mining plan for this operation entails dump trucks entering the site from the <br /> existing access road WCR 62 (Crossroads Blvd) where they will be loaded with borrow <br /> material by excavators. The dump trucks will the exit the site via existing access onto WCR <br /> 62, and then head east or west bound. WCR 62 is an existing 4 lane rural arterial roadway <br /> with a width of 60-feet. The site does not have any water diversions or impoundments. <br /> Throughout the operation, excavation will be done in 5' to 6' lifts on 15'x20' wide flattened <br /> areas for trucks to set level during loading. The operation on the 55 acre site will take place <br /> in one phase that has already started under the state issued 111 permit No. M-2021-020 for <br /> mining on the site. The primary commodity to be mined is sandy clay borrow material. <br /> Sandy clay borrow material is being removed for the purpose of creating a reservoir. <br /> Excavated sandy clay borrow material is being used for the 1-25 expansion project by <br /> CDOT. Additionally, some of the sandy clay borrow material will be used for development <br /> in the surrounding area. <br /> TST.INC.CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.