My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-19_PERMIT FILE - M2021049 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021049
>
2021-07-19_PERMIT FILE - M2021049 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 4:38:58 AM
Creation date
7/20/2021 6:19:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021049
IBM Index Class Name
PERMIT FILE
Doc Date
7/19/2021
Doc Name
Application
From
VIMA Partners, LLC
To
DRMS
Email Name
PSH
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Material Regular 112 Operation Reclamation Exhibits <br /> Raindance Reservoir#2—VIMA Partners, LLC <br /> Exhibit D — Mining Plan <br /> The mining plan shall supply the following information, correlated with the affected lands, <br /> map(s) and timetables: <br /> (a) description of the method(s) of mining to be employed in each stage of the operation as <br /> related to any surface disturbance on affected lands; <br /> Dump trucks will enter the site from the existing access road of WCR 62 <br /> (Crossroads Blvd) where they will be loaded with borrow material by excavators. <br /> The dump trucks will then exit the site via existing access onto WCR 62, and then <br /> head east or west bound. <br /> (b) earthmoving; <br /> Earthmoving will move from west to east. <br /> (c) all water diversions and impoundments; and <br /> None <br /> (d) the size of area(s) to be worked at any one time. <br /> Excavation will be done in 5' to 6' lifts, and 15'x20' wide flattened areas for trucks <br /> to set level during loading. <br /> (e) An approximate timetable to describe the mining operation. The timetable is for the <br /> purpose of establishing the relationship between mining and reclamation during the <br /> different phases of a mining operation. An Operator/Applicant shall not be required to <br /> meet specific dates for initiation, or completion of mining in a phase as may be identified <br /> in the timetable. This does not exempt an Operator/Applicant from complying with the <br /> performance standards of Rule 3.1. If the operation is intended to be an intermittent <br /> operation as defined in Section 34- 32.5-103(11)(b), C.R.S., the Applicant should <br /> include in this exhibit a statement that conforms to the provisions of Section 34-32.5- <br /> 103(11)(b), C.R.S. Such timetable should include: <br /> (i) an estimate of the periods of time which will be required for the various stages or <br /> phases of the operation; <br /> Excavation is anticipated to continue through November 2022. Filling the <br /> reservoir with water is anticipated to take 4-6 months. <br /> (ii) a description of the size and location of each area to be worked during each <br /> phase; and <br /> The project will be completed in one phase. <br /> (iii) outlining the sequence in which each stage or phase of the operation will be <br /> carried out. <br /> The project will be completed in one phase. <br /> (f) A map (in Exhibit C - Pre-Mining and Mining Plan Maps(s) of Affected Lands, Rule 6.4.3) <br /> may be used along with a narrative to present the following information: <br /> (i) nature, depth and thickness of the deposit to be mined and the thickness and <br /> type of overburden to be removed (may be marked "CONFIDENTIAL," pursuant <br /> to Rule 1.3(3)); and <br /> (ii) nature of the stratum immediately beneath the material to be mined in <br /> sedimentary deposits. <br /> (g) Identify the primary and secondary commodities to be mined/extracted and describe the <br /> intended use; and <br /> The primary commodity to be mined is sandy clay borrow material. Sandy clay <br /> borrow material is being removed for the purpose of creating a reservoir. <br /> MII <br /> TST.INC.CONSVLTI NG ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.