Laserfiche WebLink
structures; roadways will be either stabilized to remain as permanent, or reclaimed by ripping followed <br /> by topsoiling and seeding; all stockpiled topsoil will be spread and seeded; all product stockpiles will be <br /> removed; all equipment and supplies will be removed; and the operations pad area will be ripped, <br /> topsoiled and seeded. <br /> Phase II <br /> The acreage for Phase II is included in this conversion application. But the plans for disturbance and <br /> reclamation of the Phase II area have not been developed at this time, and there will not be any <br /> disturbance there until the permit is properly revised. <br />