My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-13_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2021-07-13_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 6:51:10 AM
Creation date
7/14/2021 6:44:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
7/13/2021
Doc Name Note
Findings & Reclamation Cost Estimate (Revised)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Sitewide update for Mid-term Review 8 <br /> Site: Elk Creek Mine Permit Action: MT8 Permit/Job#: C1981022 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 7/8/2021 County: Delta Filename: CO22-000 <br /> User: LDS <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill and Regrade Elk Creek Facilities Area DOZER 3 194.68 $220,672 <br /> 004 Backfill and Grade Material Used to Widen Access DOZER 3 1.53 $1,738 <br /> Road <br /> 005 Backfill and Regrade Elk Creek Mine Area DOZER 3 101.64 $115,215 <br /> 006 Move Fill Material from Elk Creek Mine to Elk SCRAPERI 1 45.33 $40,628 <br /> Creek Faciliti <br /> 008 Backfill and Regrade Primary Riprap Borrow Area DOZER 3 4.75 $5,390 <br /> 009 Backfill and Regrade Secondary Riprap Borrow DOZER 3 12.05 $13,654 <br /> Area <br /> 010 Backfill and Regrade Elk Creek Mine Rock Safety DOZER 3 23.52 $26,665 <br /> Catch Bench <br /> Oil Backfill and Regrade Temporary Conveyor DOZER 3 11.87 $13,457 <br /> Corridor <br /> 012 Regrade Expanded Elk Creek Mine Fan Bench DOZER 3 1.06 $1,197 <br /> 016 Broadcast Seed Drill Pads and Roads REVEGE 1 41.44 $37,137 <br /> 023 Spread Overburden on East Refuse Pile SCRAPERI 1 12.91 $11,567 <br /> 034 Rip All Surface Facility Areas RIPPER 3 29.04 $36,310 <br /> 041 Regrade Lower Power Line Access Road EXCAVATE 1 41.01 $7,993 <br /> 042 Regrade Pond C Access Road DOZER 3 3.85 $4,364 <br /> 050 Finish Grade All Disturbed Areas GRADER 1 53.85 $9,411 <br /> 066 Remove Upper Hubbard Creek Sediment Pond DOZER 1 2.99 $1,128 <br /> 067 Regrade East Bench Pond DOZER 1 0.61 $229 <br /> 068 Excavate/Backfill Pond C Wall Area EXCAVATE 1 1.67 $326 <br /> 069 Regrade West Valley Fill Diversion EXCAVATE 1 1.81 $354 <br /> 071 Remove Sewage Leach Field DOZER 1 0.61 $229 <br /> 072 Regrade Pond A DOZER 1 0.61 $229 <br /> 073 Regrade Pond B DOZER 1 26.02 $9,830 <br /> 075 Regrade Pond E DOZER 1 4.39 $1,657 <br /> 077 Regrade Pond F DOZER 1 2.26 $853 <br /> 090 Replace Topsoil from Stockpile to Previously SCRAPERI 1 1.86 $1,670 <br /> Disturbed Elk A <br /> 092 Replace Topsoil from Stockpile to East Refuse SCRAPERI 1 5.07 $4,545 <br /> Area <br /> 093 Replace Topsoil from Stockpile to West Valley Fill SCRAPERI 1 27.58 $24,724 <br /> Area <br /> 094 Replace Topsoil from Stockpile to II-West Refuse SCRAPERI 1 5.80 $5,195 <br /> Pile <br /> 095 Replace Topsoil from Stockpile to II West Refuse SCRAPERI 1 1.09 $977 <br /> Pile Road <br />
The URL can be used to link to this page
Your browser does not support the video tag.