Laserfiche WebLink
KILGORE <br /> COlO L a I ( )A�EAK2e <br /> ATERIALS <br /> July 9th, 2021 <br /> CDPHE RECEIVED <br /> Attn: Caren Johannes <br /> 4300 Cherry Creek Drive South 11L 13 2021 <br /> Denver, CO. 80246 DIVISION <br /> OF RECI,g <br /> RE: Spill # 2021-0223 MATION <br /> MINING&SAFS7ry <br /> Dear Caren Johannes- <br /> Regarding Spill# 2021-0223 incident at our Vagneur Gravel Pit located at 7911 Upper River Road Woody Creek, CO. <br /> I have put together several attached documents that detail the incident. This event was caused by a generator catching <br /> fire around 4:00 am on May 20',2021. The Aspen Fire Protection District responded and put the fire out.We reported <br /> the spill because we could not account for approximately 100 gallons of diesel fuel. We hired Environmental& <br /> Disaster Restoration,Inc. (ECOS)to help us remediate the cleanup. I have provided their report which includes their <br /> sketches of the before and afterwards cleanup,photos, a detailed explanation of the scope of work performed and the <br /> lab analysis report. I have also included the Aspen Fire Protection District report and a local news article for your <br /> review. <br /> The Vagneur Gravel Pit is owned by Kilgore Companies LLC. dba Elam Construction. The excavated material is <br /> estimated at 63 tons and is being stored on site. We have a Hot Mix Asphalt Plant,Permit# 09PIl 168. We would like <br /> to blend the material with our Reclaimed Asphalt Pavement(RAP).I have attached photos of our considerable amount <br /> of RAP as well as our HMA facility. This would be the most economical way to dispose of the excavated material. <br /> Please feel free to contact me with any questions,concerns at(970-712-6634)or <br /> jim.doody@elamconstruction.com. <br /> Kindest Regards,_ <br /> f <br /> Jim Doody <br /> Environmental Manager <br /> Kilgore Companies-Colorado Companies <br /> 556 Struthers Avenue—Grand Junction, CO 81501 <br /> Cc: Amy Yeldell-DRMS <br />