Laserfiche WebLink
Chavers Mining Resource Table 4 <br /> SWSP Plan Year 2021 -2022 <br /> Total Uniagged/Lagged Depletions <br /> tort/ Depletion Sourcelsl <br /> Aggregate Mining Depletions Pum p Basin&Dewatering Trench(Evap.Depletions)and Water Extracted with Aggregate It (Open.Depletions) <br /> Aggregate Processing Depletions Wash Ponds(Evaporative Depletions)and Dust Control(Operational Depletions) <br /> Concrete Production Depletions Alluvial Well Water Used for Concrete Production(Operational Depletions) <br /> Unlagged Source Depletions Lagged Source Depletions Net Water Depletions <br /> (2) (3) (4) (5) (6) (7) <br /> Month--Year Aggregate Aggregate Concrete Aggregate Aggregate Concrete Sum of Lagged <br /> Mining Processing Production Mining Processing Production Source Depletions <br /> [acre-feet] (acre-feet) [acre-feet] (acre-feet] [acre-feet] [acre-feet] [acre-feet] <br /> August-2Q21 2-31 1-10 1-55 2.20 0.96 1AS 4,34 <br /> Septe rn ber-2 02 1 2-1711 1,28 2.09 0.88 1-22 4-19 <br /> --------- <br /> October-2021 1-9114 0,56 1.65 1.95 0.74 1,33 4.02 <br /> - - --------------------------- <br /> November-2,021 1.63 0-30 1-06 1.71 0_157 1.21 3-49 <br /> - --December-2021 1-21--0.03 0,74 1-38 013 9 0-97 ...... 2,74 <br /> January-2_022 1-59 0-03 1.12 1-54 0.28 1'00 2-82 <br /> February-2022 1,57 0.26 0-78 1-57 0.30 0,94 2.81 <br /> March-2022 1.63 0.37 033 1-61 0.37 0,92 14-90 <br /> -April-202' 7,06 0.62 1A6 1-90 0.47 1.02 3,39 <br /> May-2021) 2,29 1O.82 111 2-13 0.61 1.07 3,81 <br /> June-2022 7.4 3 1-18 115 2-28 0.79 1.12 4.19 <br /> July-2022 2-45 1-22 1,55 2,34 0.93 1.28 4.55 <br /> TOTALS- 2-2,7 7-32 1 -1 22-70 7.29 13.26 43-25 <br /> Notes: <br /> (1) Depletions from Pump Basin&Dewatering Trench(Evaporative)and Water Extracted with Aggregate Mined(Operational) <br /> [Table 2-Column(83]+[Table 3-Colum n(2)] <br /> (2) Depletions from Wash Ponds(Evaporative)and Dust Control(Operational) <br /> [Table 2-Column(9)]-f[Table 3-Column(3)] <br /> (3) Depletions from Alluvial Well Water Used in Concrete Production(Operational) <br /> [Table 3-Column(5,11 <br /> (4) Column(1)Lagged(Real Time)Stream Depletions Using AWAS <br /> (5)=Column(2)Lagged(Real Time)Stream Depletions Using AWAS <br /> (G)a Column(3)Lagged(Real Time)Stream Depletions Using AWAS <br /> (7)A Total Lagged Depletions <br /> [Column(4)+Column(5)+Column (6)] <br />