Laserfiche WebLink
Chavers Mining Resource Table 3 <br /> SWSP Plan Year 2021-2022 <br /> Operational Water Depletions <br /> Source Amount <br /> Sand&Gravel Aggregate Production(Annual) 700,000 tons <br /> Concrete Production 154,000 cubic yards <br /> Dust Control 1.25 acre-feet <br /> Aggregate Mining Aggregate Processingr�crete Production fatal Operational <br /> Depletions <br /> Month Year (1) [ ] ) ] ) (5) ( <br /> Monthly Aggregate Water Extracted dater Used for Concrete Alluvial Well dater for Surn of Operational <br /> Mined with Aggregate Dust Control Production Concrete Production dater Used <br /> [tons] [acre-feet] [acre-feet] [cubic yards] [acre-feet] [acre-feet) <br /> August-2021 65.E 1191 OA8 16,820 3.64 <br /> September-2021 62,000 1Z3 015 13,95 1-28 3_2 <br /> October-2021 59,=o 134 0.1n 17,950 1,65 3.49 <br /> November-2021 1553 OL611,470 1,06 165 <br /> December 2021 411,000 L21 0.€ 5 8,000 034 L99 _. <br /> January-2022 54,000 L59 OL3 12,170 1.12 2774 <br /> February-2022 50,000 L47 0.05 8,500 0388 2.2 <br /> March 51, E L50 0 06 10,1-,0 0.93 2,49 <br /> April-2022 62,000 1. 3 0A0 12,E 116 109 <br /> May-2022 68,000 2, C D 5 1Z020 IAA 3 2 <br /> June_2022 68,000 100 018 13,570 1.25 3A3 <br /> July-2022 68,000 <br /> _ �.00 013 1 , [0? 1.55 3.73 <br /> TOTAI : 700,000.00 20 1 1. 5 154, 0 _0 14.18 -0 <br /> Notes: <br /> (1)=Estimated monthly portion of annual sand&gravel production(700,000 tons) <br /> (2)=Water removed with mired product)assumes 4%water by mess per General Guidelines for Substitute�I.Vater Supply Plans for and and Gravel tarts) <br /> =(Colomn(1)x)O.0 )x(2,0000 lbs./ton)x{1 W/614 lbs.)x(1 acre-ft 43,5 _)) <br /> (5)= Predicted volume of water used for dust control <br /> ( )=Estimated concrete production <br /> (5)= Estimated alluvial well water used(assumes 30 galions/eubicyard of concrete) <br /> (5)=Total monthly water used for operations <br /> = [Column(2)-Column( )®Column(5)) <br />